SHELBY ELECTRICAL
Live / Registered — Registered (as of 30 Sept 2025)
What this means for you
Registered since 30 Sept 2025. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98904946
- Registration number
- 7965525
- Mark type
- Stylized text
- Filed
- 16 Dec 2024
- Published for opposition
- 12 Aug 2025
- Registered
- 30 Sept 2025
Goods and services
- Class 009 — Scientific and electric apparatus: Electrical distribution systems, namely, power distribution panels
- Class 037 — Building construction and repair services: Electrical contracting; Electrical contractor services; Electrical repairs, maintenance, and installation of electrical wiring, outlets, light fixtures, and electrical panels; Comprehensive preventative maintenance service for electrical systems; Contractor services, namely, review of and remedial recommendations for building plumbing, electrical and mechanical systems for others; Installation of electrical wiring; Installation of wiring and power supply equipment for transmission and distribution of electricity suitable for electric vehicle recharging stations; Installation of wiring in accessible geographical locations for distribution of electricity suitable for electric vehicle recharging stations; Installation, maintenance and repair of electrical lighting apparatus; Repair or maintenance of electric lighting apparatus; Repair or maintenance of electric motors
Owner
- Shelby Electrical Corp, Brooklyn, NY, US
- Shelby Electrical Corp, Brooklyn, NY, US
- Shelby Electrical Corp, Brooklyn, NY, US
Prosecution history
- 30 Sept 2025 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 30 Sept 2025 — REGISTERED-PRINCIPAL REGISTER
- 12 Aug 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 12 Aug 2025 — PUBLISHED FOR OPPOSITION
- 06 Aug 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 01 Jul 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 10 Jun 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 10 Jun 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 10 Jun 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 10 Jun 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 10 Jun 2025 — NON-FINAL ACTION E-MAILED
- 10 Jun 2025 — NON-FINAL ACTION WRITTEN
- 03 Jun 2025 — ASSIGNED TO EXAMINER
- 16 Dec 2024 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 16 Dec 2024 — NEW APPLICATION ENTERED