DATA WORX
Live / Applied — Second extension granted (statement of use) (as of 08 Sept 2026)
What this means for you
Not registered yet, but its 13 Dec 2024 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98901247
- Mark type
- Stylized text
- Filed
- 13 Dec 2024
- Published for opposition
- 15 Jul 2025
- Attorney of record
- Jonathan G. Pollmann
Goods and services
- Class 002 — Paints: bonding primers; bonding primers, namely, bonding primers for application to metal surfaces; bonding primers, namely, bonding primers for application to heating, ventilation, and air conditioning air-cooled heat exchangers; bonding primers, namely, bonding primers for application to air-cooled air conditioning, refrigeration, thermal management, and industrial process heat exchangers; bonding primers, namely, bonding primers for application to solar panels; anti-tarnishing preparations for coating metals; corrosion inhibitors in the nature of coatings for apparatus in the field of air-conditioning, refrigeration, thermal management, and industrial process heat exchangers; corrosion inhibitors in the nature of coatings for solar panels; conductive coatings made of water-based acrylic paints containing graphene for corrosion protection of metal surfaces; conductive coatings made of water-based acrylic paints containing graphene for improved efficiency and corrosion protection of heating, ventilation, and air conditioning air-cooled heat exchangers; conductive coatings made of water-based acrylic paints containing graphene for improved efficiency and corrosion protection of air-cooled air conditioning, refrigeration, thermal management, and industrial process heat exchangers; conductive coatings made of water-based acrylic paints containing graphene for improved efficiency of solar panels
Owner
- Nu-Calgon Wholesaler, Inc., St. Louis, MO, US
- Nu-Calgon Wholesaler, Inc., St. Louis, MO, US
Prosecution history
- 09 Sept 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 08 Sept 2026 — SOU EXTENSION 2 GRANTED
- 08 Sept 2026 — SOU EXTENSION 2 FILED
- 08 Sept 2026 — SOU TEAS EXTENSION RECEIVED
- 28 Feb 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 27 Feb 2026 — SOU EXTENSION 1 GRANTED
- 27 Feb 2026 — SOU EXTENSION 1 FILED
- 27 Feb 2026 — SOU TEAS EXTENSION RECEIVED
- 09 Sept 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 15 Jul 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 15 Jul 2025 — PUBLISHED FOR OPPOSITION
- 09 Jul 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 10 Jun 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 01 Jun 2025 — ASSIGNED TO EXAMINER
- 27 Apr 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED