ENERGIZED WORLD
Live / Allowed — Notice of allowance issued (as of 18 Nov 2025)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 27 Nov 2024 filing date already counts against anyone who files later.
Record
- Serial number
- 98875704
- Mark type
- Stylized text
- Filed
- 27 Nov 2024
- Published for opposition
- 23 Sept 2025
- Attorney of record
- Ani Agrawal
Goods and services
- Class 037 — Building construction and repair services: Drilling of wells for the extraction of oil or gas; Installation, cleaning, maintenance and repair of drilling rigs and drilling rig equipment; Pipeline construction and maintenance
- Class 039 — Transportation and storage services: Transportation of oil, gas, and oil-based products by land vehicle, air vehicle, water vehicle, rail vehicle, or pipeline; Distribution of natural gas, gas, oil, and oil-based products
- Class 040 — Treatment of materials: Treatment and processing of natural gas; Power generation; Oil production and gas production services; Professional technical consultancy in the fields of oil and gas production
- Class 042 — Scientific and technological services: Prospecting for oil and gas; Oil field and gas field exploration; Analysis, surveying and testing services, namely, oil and gas well testing, relating to oil and gas fields; Chemical and technical research services related to oil and gas fields; Professional consultancy services in the fields of oil and gas field exploration
Owner
- Chord Energy LLC, Houston, TX, US
- Chord Energy LLC, Houston, TX, US
Prosecution history
- 18 Nov 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 23 Sept 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 23 Sept 2025 — PUBLISHED FOR OPPOSITION
- 17 Sept 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 25 Aug 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 22 Aug 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 21 Aug 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 21 Aug 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 21 May 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 21 May 2025 — NON-FINAL ACTION E-MAILED
- 21 May 2025 — NON-FINAL ACTION WRITTEN
- 20 May 2025 — ASSIGNED TO EXAMINER
- 27 Nov 2024 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 27 Nov 2024 — NEW APPLICATION ENTERED