S&S DIRECTIONAL BORING, LTD.
Live / Applied — Statement of use — registration review complete (as of 09 Sept 2026)
What this means for you
Not registered yet, but its 25 Oct 2024 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98820171
- Mark type
- Design + words
- Filed
- 25 Oct 2024
- Published for opposition
- 16 Dec 2025
- Attorney of record
- Daniel J. Smola
Goods and services
- Class 037 — Building construction and repair services: directional drilling and boring services for utilities, namely, directional drilling and boring for installing electric cables, telecommunication cables, data cables, water pipelines, sewer pipelines, gas pipelines, oil pipelines; water pipe, sewer pipe, gas pipe, and oil pipe replacement and installation services, namely, pipe bursting services; water pipe, sewer pipe, gas pipe, and oil pipe replacement and installation services, namely, pipe fusion services; pipe installation services, namely, the installation of HDPE pipe, PVC pipe, ductile iron pipe, water lines, sewer lines, conduit, and mainline; utilities installation services on solar installation projects in the nature of boring for conduit, trenching for MC and AC cables, excavation and preparation for inverter skids, excavation and installation of splice boxes, and pouring concrete for transformer pads; hydro excavation services; excavation services, namely, trenching in the nature of subsurface excavation and trench construction for new utilities
Owner
- S&S Directional Boring, Ltd., Bryan, OH, US
- S&S Directional Boring, Ltd., Bryan, OH, US
Prosecution history
- 09 Sept 2026 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 09 Sept 2026 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 08 Sept 2026 — STATEMENT OF USE PROCESSING COMPLETE
- 10 Aug 2026 — USE AMENDMENT FILED
- 10 Aug 2026 — TEAS STATEMENT OF USE RECEIVED
- 10 Feb 2026 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 16 Dec 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 16 Dec 2025 — PUBLISHED FOR OPPOSITION
- 10 Dec 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 17 Nov 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 17 Nov 2025 — EXAMINER'S AMENDMENT ENTERED
- 17 Nov 2025 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
- 17 Nov 2025 — EXAMINERS AMENDMENT E-MAILED
- 17 Nov 2025 — EXAMINERS AMENDMENT -WRITTEN
- 12 Nov 2025 — ASSIGNED TO EXAMINER