C
Live / Allowed — Notice of allowance issued (as of 28 Oct 2025)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 22 Oct 2024 filing date already counts against anyone who files later.
Record
- Serial number
- 98814941
- Mark type
- Design + words
- Filed
- 22 Oct 2024
- Published for opposition
- 02 Sept 2025
- Attorney of record
- Trent L. Hoffman
Goods and services
- Class 009 — Scientific and electric apparatus: Energy generation, storage, and delivery equipment, namely, off-grid power systems comprised primarily of batteries, charge controllers, circuit breakers, switchgears and electrical inverters to boost electrical service at sites, shave peak demand, conduct demand response, power delivery, isolate islanded microgrids, and provide emergency backup power
- Class 039 — Transportation and storage services: Energy storage and delivery services; electricity storage and delivery services; Energy solutions, namely, storage and delivery of energy to boost electrical service at sites, shave peak demand, conduct demand response, power delivery, isolate islanded microgrids, and provide emergency backup power; providing information in the field of energy storage and delivery and electricity storage and delivery
- Class 040 — Treatment of materials: Energy generation services; electricity generation services; Energy solutions, namely, generation of energy to boost electrical service at sites, shave peak demand, conduct demand response, power delivery, isolate islanded microgrids, and provide emergency backup power; providing information in the field of energy generation and electricity generation
Owner
- Critical Loop, Inc., Long Beach, CA, US
- Critical Loop, Inc., Los Angeles, CA, US
Prosecution history
- 27 Mar 2026 — TEAS STATEMENT OF USE RECEIVED
- 28 Oct 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 02 Sept 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 02 Sept 2025 — PUBLISHED FOR OPPOSITION
- 27 Aug 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 29 Jul 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 24 Jul 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 24 Jul 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 24 Jul 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 01 May 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 01 May 2025 — NON-FINAL ACTION E-MAILED
- 01 May 2025 — NON-FINAL ACTION WRITTEN
- 24 Apr 2025 — ASSIGNED TO EXAMINER
- 23 Apr 2025 — NOTICE OF DESIGN SEARCH CODE E-MAILED
- 23 Apr 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED