EQUITONE INSPIRES

Live / Allowed — Notice of allowance issued (as of 28 Oct 2025)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 22 Oct 2024 filing date already counts against anyone who files later.

Record

Serial number
98813977
Mark type
Stylized text
Filed
22 Oct 2024
Published for opposition
02 Sept 2025
Attorney of record
Angela Alvarez Sujek

Goods and services

  • Class 017 — Rubber goods: Building insulation and infiltration barrier articles and materials; thermal insulation articles and materials, namely, fire-resistant composite panels made of aramid, glass, carbon or ceramic fibers; acoustic insulation articles and materials in the nature of acoustic insulation panels; acoustic insulating boards, in the nature of acoustic insulation panels; fire resistant and fire preventive articles and materials in the nature of fire-resistant doors comprised of reinforced cement and steel; fire resistant and fire preventive boards in the nature of fire-resistant doors comprised of reinforced cement and steel; waterproofing and moisture proofing articles and materials in the nature of insulating waterproofing membranes; waterproofing and moisture proofing boards in the nature of insulating waterproofing tiles; insulating sleeves and linings for power lines; insulating coatings; insulating paints; insulating paints for sealing; adhesive tapes, strips, bands and plastic film for use in commercial or industrial manufacturing and for industrial use; insulating tapes; non-metallic seals, adhesive sealants and expansion joint fillers for industrial use; wallboard jointing compounds; adhesive sealant compounds; adhesive drywall joint tapes for plasterboards
  • Class 019 — Non-metallic building materials: Building and construction materials and elements, not of metal, namely, fiber cement boards, non-metal cladding for construction and building, and non-metal façade panels for construction purposes, not-metal roofing panels, not-metal ceiling panels; structures being non-metal transportable pavilions and transportable buildings, not of metal; building and construction materials and elements made of sand, stone, rock, clay, minerals, fibre-cement, cement and concrete, namely, non-metal cladding for construction and building, and non-metal façade panels for construction purposes; cement slabs; non-metal claddings for construction and building of roofs, façades and walls, tiles, slates, sheets, panels and boards; roofing materials, not of metal, namely, nonmetal roofing panels; concrete, fiber cement and cement cladding panels, fiber cement and cement boards, sheets, slates and tiles, not of metal, for building; paving slabs, not of metal; decking, not of metal; prefabricated and prefinished building parts, not of metal, namely, non-metal cladding for construction and building, and non-metal façade panels for construction purposes, not-metal roofing panels, not-metal ceiling panels, prefabricated not-metal walls; fibre cement boards; insulating cement boards; insulating building panels, not of metal
  • Class 040 — Treatment of materials: Custom manufacture of insulating building materials; printing of patterns and customized graphics on cladding panels, boards, sheets, slates and tiles; pattern printing of floor coverings; pattern printing of wall coverings

Owner

Prior registrations

Prosecution history

  • 04 Mar 2026 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
  • 04 Mar 2026 — ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
  • 04 Mar 2026 — TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
  • 04 Mar 2026 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
  • 04 Mar 2026 — ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
  • 04 Mar 2026 — TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
  • 28 Oct 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 02 Sept 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 02 Sept 2025 — PUBLISHED FOR OPPOSITION
  • 27 Aug 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 01 Aug 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 15 Jul 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 15 Jul 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 15 Jul 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 05 May 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED

View this trademark record on Marksy