ELECTRICAL POWER PRODUCTS

Live / Applied — Final refusal mailed (as of 07 Jan 2026)

What this means for you

Not registered yet, but its 22 Oct 2024 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
98813723
Mark type
Stylized text
Filed
22 Oct 2024
Attorney of record
Aaron C. Jones

Goods and services

  • Class 009 — Scientific and electric apparatus: Electric and electronic apparatus, devices, instruments, components and equipment including those for the distribution of electrical power and use of energy, namely dual switchboard, vertical switchboard, open and closed cubicle, duplex switchboard, and cabinets; electrical power management systems, namely, control enclosures and transclosures, relay panels, and control panels for electricity generation, transmission, and distribution; medium-voltage switching equipment; electronic power supplies for high voltage and extra-high voltage for interconnection facilities; electrical power transmission and distribution equipment and devices for control, metering, measurement, fault detection and clearing, and power supply products, namely, circuit breakers, switchgears, breaker panels, circuit breaker panels, power distribution panels, electric meters, volt meters, meter mounting panels, ammeters, battery switches, electrical connectors
  • Class 035 — Advertising and business services: Technical consulting in the field of energy usage management and energy efficiency of power availability, power protection, and power management systems
  • Class 037 — Building construction and repair services: Electrical contracting services; commercial electrical contracting services; industrial electrical contracting services; electrical system repair services; electrical system maintenance services; electrical system installation services; electrical system construction consultation services; constructions services, namely, installation, repair, and maintenance of electrical systems; electrical system construction for commercial and industrial applications; electrical contracting; electricity transmission plant construction services; assembly, installation, and maintenance of power availability, power protection, and power management systems for others

Owner

Prosecution history

  • 07 Jan 2026 — NOTIFICATION OF FINAL REFUSAL EMAILED
  • 07 Jan 2026 — FINAL REFUSAL E-MAILED
  • 07 Jan 2026 — FINAL REFUSAL WRITTEN
  • 14 Nov 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 14 Nov 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 14 Nov 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 22 Aug 2025 — APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED
  • 22 Aug 2025 — APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED
  • 22 May 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 22 May 2025 — NON-FINAL ACTION E-MAILED
  • 22 May 2025 — NON-FINAL ACTION WRITTEN
  • 21 Apr 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 21 Apr 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 21 Apr 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 12 Feb 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED