GRID I.S.
Live / Allowed — Notice of allowance issued (as of 11 Nov 2025)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 17 Oct 2024 filing date already counts against anyone who files later.
Record
- Serial number
- 98807547
- Mark type
- Stylized text
- Filed
- 17 Oct 2024
- Published for opposition
- 16 Sept 2025
- Attorney of record
- Yifei Zou
Goods and services
- Class 009 — Scientific and electric apparatus: Electric cables; Electric wires; Capacitors; Voltage regulators; Voltage regulators for electric power; Overvoltage protection relays; Surge protectors; Distribution boards, namely, electrical power distribution units; Electrical distribution boxes; Electrical distribution consoles; Electrical Reactors; Switchboards; Lightning conductors; Lightning arrester equipment; Solar batteries; Solar panels for the production of electricity; Plates for batteries; Galvanic batteries; Electric batteries; Battery chargers; Photovoltaic solar modules for production of electricity; Apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar modules; Apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar hybrid modules; Photovoltaic installation apparatus, namely, solar modules for production of electricity, solar thermal and electric receivers, tracking mechanisms and concentrating optics, and control algorithms; Solar panels for the production of electricity; Heliostats for use with electricity-generating solar panels; Photovoltaic solar panels for the production of electricity; Battery Energy Storage System (BESS) comprised of batteries, battery cables, and battery boxes
Owner
- Chint Electric America LLC, Irvine, CA, US
- Chint Electric America LLC, Irvine, CA, US
Prosecution history
- 11 Nov 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 16 Sept 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 16 Sept 2025 — PUBLISHED FOR OPPOSITION
- 10 Sept 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 14 Aug 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 28 Jul 2025 — PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED
- 28 Jul 2025 — TEAS VOLUNTARY AMENDMENT RECEIVED
- 25 Jul 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 25 Jul 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 25 Jul 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 30 Apr 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 30 Apr 2025 — NON-FINAL ACTION E-MAILED
- 30 Apr 2025 — NON-FINAL ACTION WRITTEN
- 21 Apr 2025 — ASSIGNED TO EXAMINER
- 18 Apr 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED