POWERED BY PERFORMANCE AND PEOPLE

Dead / Abandoned — Abandoned — failure to respond (as of 30 Oct 2025)

What this means for you

This application is over — abandoned 17 Oct 2025. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.

Record

Serial number
98793028
Mark type
Stylized text
Filed
09 Oct 2024
Abandoned
17 Oct 2025
Attorney of record
Thomas G Dickson

Goods and services

  • Class 037 — Building construction and repair services: Commercial building construction; Construction grading services; Construction of airports; Construction of civil engineering structures; Construction of civil engineering structures by forming concrete; Construction of civil engineering structures by laying concrete; Construction of civil engineering structures by pouring concrete; Construction of civil engineering structures using concrete; Construction of roads, underground utilities, and housing pads; Construction of wind power plants; Construction services, namely, concrete paving, site clearing, excavation, pad preparation, grading, and asphalt paving services; Construction services, namely, installation of environmental containment systems; Consulting services in the field of construction of wind energy facilities; Factory construction; General construction contracting; Hydro-electric factory construction; Hydroelectric factory construction; Laying and construction of pipelines; Pipeline construction; Road construction

Owner

Prosecution history

  • 30 Oct 2025 — ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND
  • 30 Oct 2025 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
  • 16 Jul 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 16 Jul 2025 — NON-FINAL ACTION E-MAILED
  • 16 Jul 2025 — NON-FINAL ACTION WRITTEN
  • 16 Jul 2025 — LETTER OF PROTEST EVIDENCE REVIEWED - ACTION TAKEN
  • 23 Jun 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 23 Jun 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 23 Jun 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 18 Jun 2025 — LETTER OF PROTEST EVIDENCE FORWARDED
  • 21 Mar 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 21 Mar 2025 — NON-FINAL ACTION E-MAILED
  • 21 Mar 2025 — NON-FINAL ACTION WRITTEN
  • 21 Mar 2025 — ASSIGNED TO EXAMINER
  • 09 Oct 2024 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

View this trademark record on Marksy