POWERED BY PERFORMANCE AND PEOPLE
Dead / Abandoned — Abandoned — failure to respond (as of 30 Oct 2025)
What this means for you
This application is over — abandoned 17 Oct 2025. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 98793028
- Mark type
- Stylized text
- Filed
- 09 Oct 2024
- Abandoned
- 17 Oct 2025
- Attorney of record
- Thomas G Dickson
Goods and services
- Class 037 — Building construction and repair services: Commercial building construction; Construction grading services; Construction of airports; Construction of civil engineering structures; Construction of civil engineering structures by forming concrete; Construction of civil engineering structures by laying concrete; Construction of civil engineering structures by pouring concrete; Construction of civil engineering structures using concrete; Construction of roads, underground utilities, and housing pads; Construction of wind power plants; Construction services, namely, concrete paving, site clearing, excavation, pad preparation, grading, and asphalt paving services; Construction services, namely, installation of environmental containment systems; Consulting services in the field of construction of wind energy facilities; Factory construction; General construction contracting; Hydro-electric factory construction; Hydroelectric factory construction; Laying and construction of pipelines; Pipeline construction; Road construction
Owner
- Ames Construction, Burnsville, MN, US
Prosecution history
- 30 Oct 2025 — ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND
- 30 Oct 2025 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
- 16 Jul 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 16 Jul 2025 — NON-FINAL ACTION E-MAILED
- 16 Jul 2025 — NON-FINAL ACTION WRITTEN
- 16 Jul 2025 — LETTER OF PROTEST EVIDENCE REVIEWED - ACTION TAKEN
- 23 Jun 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 23 Jun 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 23 Jun 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 18 Jun 2025 — LETTER OF PROTEST EVIDENCE FORWARDED
- 21 Mar 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 21 Mar 2025 — NON-FINAL ACTION E-MAILED
- 21 Mar 2025 — NON-FINAL ACTION WRITTEN
- 21 Mar 2025 — ASSIGNED TO EXAMINER
- 09 Oct 2024 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED