POWERED BY PERFORMANCE
Live / Applied — First extension granted (statement of use) (as of 20 Mar 2026)
What this means for you
Not registered yet, but its 09 Oct 2024 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98793012
- Mark type
- Stylized text
- Filed
- 09 Oct 2024
- Published for opposition
- 29 Jul 2025
- Attorney of record
- Thomas G. Dickson
Goods and services
- Class 037 — Building construction and repair services: Commercial building construction; Construction grading services; Construction of airports; Construction of civil engineering structures; Construction of civil engineering structures by forming concrete; Construction of civil engineering structures by laying concrete; Construction of civil engineering structures by pouring concrete; Construction of civil engineering structures using concrete; Construction of roads, underground utilities, and housing pads; Construction of wind power plants; Construction services, namely, installation of environmental containment systems; Construction services, namely, concrete paving, site clearing, excavation, pad preparation, grading, and asphalt paving services; Consulting services in the field of construction of wind energy facilities; Factory construction; General construction contracting; Hydro-electric factory construction; Hydroelectric factory construction; Laying and construction of pipelines; Pipeline construction; Road construction
Owner
- Ames Construction, Burnsville, MN, US
- Ames Construction, Burnsville, MN, US
Prosecution history
- 31 Mar 2026 — TEAS STATEMENT OF USE RECEIVED
- 21 Mar 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 20 Mar 2026 — SOU EXTENSION 1 GRANTED
- 20 Mar 2026 — SOU EXTENSION 1 FILED
- 20 Mar 2026 — SOU TEAS EXTENSION RECEIVED
- 23 Sept 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 29 Jul 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 29 Jul 2025 — PUBLISHED FOR OPPOSITION
- 23 Jul 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 24 Jun 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 23 Jun 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 23 Jun 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 23 Jun 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 21 Mar 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 21 Mar 2025 — NON-FINAL ACTION E-MAILED