THEA ENERGY
Live / Applied — First extension granted (statement of use) (as of 04 Feb 2026)
What this means for you
Not registered yet, but its 09 Oct 2024 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98791881
- Mark type
- Stylized text
- Filed
- 09 Oct 2024
- Published for opposition
- 10 Jun 2025
- Attorney of record
- Dana S. Gross
Goods and services
- Class 009 — Scientific and electric apparatus: Electromagnetic apparatus used to generate or measure magnetic fields; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity; superconducting magnets, power supplies, and electromagnets; apparatus and equipment all for use in generating neutron sources, namely, neutron generators for commercial and scientific purposes and not for medical purposes; apparatus and equipment all for use in generating neutron sources, namely, neutron generators for laboratory use; electrical power management systems comprised of electrical controllers, converters or inverters, and power supplies; electrical power control systems comprised of electrical controllers, and electric converters or inverters; devices for monitoring energy storage systems, namely, electric controllers and sensors for monitoring one or more of voltage, current, charge, and temperature; recorded software for monitoring energy storage systems
- Class 011 — Environmental control apparatus: Nuclear fusion power plants
Owner
- Thea Energy, Inc., Branchburg, NJ, US
- Thea Energy, Inc., Branchburg, NJ, US
Prosecution history
- 04 Feb 2026 — SOU EXTENSION 1 GRANTED
- 03 Feb 2026 — SOU EXTENSION 1 FILED
- 03 Feb 2026 — SOU TEAS EXTENSION RECEIVED
- 30 Sept 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 10 Jun 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 10 Jun 2025 — PUBLISHED FOR OPPOSITION
- 04 Jun 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 12 May 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 12 May 2025 — EXAMINER'S AMENDMENT ENTERED
- 12 May 2025 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
- 12 May 2025 — EXAMINERS AMENDMENT E-MAILED
- 12 May 2025 — EXAMINERS AMENDMENT -WRITTEN
- 21 Apr 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 21 Apr 2025 — NON-FINAL ACTION E-MAILED
- 21 Apr 2025 — NON-FINAL ACTION WRITTEN