3B TECHNOLOGY BALLISTIC / BLAST / BREAK-IN
Live / Allowed — Notice of allowance issued (as of 06 Jan 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 07 Oct 2024 filing date already counts against anyone who files later.
Record
- Serial number
- 98788701
- Mark type
- Design + words
- Filed
- 07 Oct 2024
- Published for opposition
- 11 Nov 2025
- Attorney of record
- Dean G. Stathakis
Goods and services
- Class 019 — Non-metallic building materials: Non-metal construction and building structures that provide resistant against blast, ballistic, forced entry and natural disasters like earthquakes, fire, and high winds, namely, ballistic-, blast-, and fire-resistant pre-cast and modular concrete composite posts, columns, slabs, blocks, boards, perimeter fencing and barriers, and structural security systems thereof comprised of concrete composite posts, columns, slabs, blocks, and boards, perimeter fencing and barriers; Non-metal pre-cast and modular ballistic-, blast-, and fire-resistant concrete composite posts, columns, slabs, blocks, boards, perimeter fencing and barriers, and structural security systems thereof comprised of concrete composite posts, columns, slabs, blocks, boards, perimeter fencing and barriers; Pre-cast and modular construction structures, not made of metal, for construction purposes, namely, ballistic-, blast-, and fire-resistant concrete composite posts, columns, slabs, blocks, boards, perimeter fencing and barriers, and structural security systems thereof comprised of concrete composite posts, slabs, blocks, boards, perimeter fencing and barriers; Non-metal Ballistic-, blast-, and fire-resistant concrete composite posts, columns, slabs, blocks, boards, perimeter fencing and barriers, and structural security systems thereof comprised of concrete composite posts, columns, slabs, blocks, boards, perimeter fencing and barriers, for construction.
- Class 037 — Building construction and repair services: Construction consulting and installation services of building structures that provide resistant against blast, ballistic, forced entry and natural disasters like earthquakes, fire, and high winds; construction consulting and installation services of pre-cast and modular posts, columns, slabs, blocks, boards, panels, walls, gates, doors, perimeters and barriers, and structural security systems thereof comprised of posts, columns, slabs, blocks, boards, panels, walls, gates, doors, perimeter fencing and barriers, that provide resistant against blast, ballistic, forced entry and natural disasters like earthquakes, fire, and high winds; construction consulting and installation services of ballistic-, blast-, and fire-resistant posts, columns, slabs, blocks, panels, walls, gates, doors, perimeter fencing and barriers, and structural security systems thereof comprised of concrete composite posts, columns, slabs, blocks, boards, panels, walls, gates, doors, perimeter fencing and barriers.
Owner
- 3B Protection International, Inc., Tequesta, FL, US
- 3B Protection International, Inc., Tequesta, FL, US
Prior registrations
Prosecution history
- 06 Jan 2026 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 11 Nov 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 11 Nov 2025 — PUBLISHED FOR OPPOSITION
- 05 Nov 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 11 Oct 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 30 Jul 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 30 Jul 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 30 Jul 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 02 May 2025 — NOTIFICATION OF EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED
- 02 May 2025 — EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED
- 02 May 2025 — COMBINED EXAMINER'S AMENDMENT/PRIORITY ACTION AUTOMATIC ENTRY
- 02 May 2025 — EXAMINERS AMENDMENT AND/OR PRIORITY ACTION - COMPLETED
- 11 Apr 2025 — PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED
- 11 Apr 2025 — TEAS VOLUNTARY AMENDMENT RECEIVED
- 06 Apr 2025 — ASSIGNED TO EXAMINER