NW SUPERIOR SERVICES COMPLETING JOBS RIGHT THE FIRST TIME
Live / Allowed — Notice of allowance issued (as of 13 Jan 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 25 Sept 2024 filing date already counts against anyone who files later.
Record
- Serial number
- 98770226
- Mark type
- Design + words
- Filed
- 25 Sept 2024
- Published for opposition
- 18 Nov 2025
Goods and services
- Class 037 — Building construction and repair services: Construction services, namely, concrete paving, site clearing, excavation, pad preparation, grading, and asphalt paving services; Construction consultancy; Construction consultation; Construction management; Construction of buildings; Construction planning; Construction supervision; Building construction; Building construction supervision; Factory construction; General construction contracting; Harbor construction; Repair of construction machines and construction equipment; Road construction; Street construction
Owner
- Leibelt, Cole, Corvallis, OR, US
- Leibelt, Cole, Corvallis, OR, US
Prosecution history
- 27 Feb 2026 — TEAS STATEMENT OF USE RECEIVED
- 13 Jan 2026 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 18 Nov 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 18 Nov 2025 — PUBLISHED FOR OPPOSITION
- 12 Nov 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 20 Oct 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 19 Sept 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 19 Sept 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 19 Sept 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 19 Sept 2025 — NOTICE OF REVIVAL - E-MAILED
- 19 Sept 2025 — PETITION TO REVIVE-GRANTED
- 19 Sept 2025 — TEAS PETITION TO REVIVE RECEIVED
- 05 Aug 2025 — ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND
- 05 Aug 2025 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
- 14 Apr 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED