FENECON

Live / Allowed — Notice of allowance issued (as of 03 Feb 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 09 Sept 2024 filing date already counts against anyone who files later.

Record

Serial number
98740562
Mark type
Stylized text
Filed
09 Sept 2024
Published for opposition
09 Dec 2025
Attorney of record
Michele M. Glessner

Goods and services

  • Class 009 — Scientific and electric apparatus: Accumulators for photovoltaic power; solar panels for the production of electricity; photovoltaic apparatus and installations for generating solar electricity, namely, monitoring and control apparatus for photovoltaic installations; solar batteries for domestic use; solar batteries for industrial use; solar-powered rechargeable batteries; memory modules; computer memory devices; home, commercial and industrial electricity storage systems comprised of electrical storage batteries and photovoltaic solar modules for the production of electricity; apparatus and instruments for accumulating and storing electricity; apparatus and instruments for accumulating the distribution of electricity; apparatus and instruments for controlling electricity; rechargeable electrical cells; electrical cells and batteries; electrical power distribution units; photovoltaic inverters; inverters for power supply; apparatus and instruments for transforming electricity; apparatus and instruments for accumulating electricity; electric control devices for energy management; photovoltaic apparatus for converting solar radiation to electrical energy namely, photovoltaic solar modules; downloadable computer programs for network management; uninterruptable electrical power supply apparatus; electric power distribution apparatus in the nature of electric power distribution machines, blocks, and units; apparatus and instruments for transforming the use of electricity; apparatus and instruments for transforming the distribution of electricity; mains testers, namely, voltage testers; electric power analyzers; electric current transformers; electric current switches; electric current meters; electronic power supplies; apparatus in the nature of meters for measuring, monitoring and analyzing electricity consumption; electric current control devices; regulated power supply apparatus; instruments for distributing electrical current; voltage-to-current converters; voltage regulators for electric power; electricity current limiters; power units, namely, electrical power distribution units; electricity measuring instruments, namely, clamp meters; switchboxes; power line conditioners; electricity storage apparatus in the nature of batteries; voltage surge protectors; electric power units, namely, electrical power distribution units; power distributors in the nature of electrical power distribution blocks; panels for the distribution of electricity, namely, power distribution panels; power distributing boxes; converters, electric; lithium iron phosphate batteries; lithium iron phosphate battery; power conditioning apparatus, namely, transient voltage surge suppressors with power conditioning technology
  • Class 035 — Advertising and business services: Retail store and wholesale store services featuring batteries, solar modules, electricity storage apparatus; retail store and wholesale store services featuring network support components.
  • Class 037 — Building construction and repair services: Maintenance and repair of solar power installations; installation of solar panel systems for commercial and residential buildings; construction of utility solar installations; repair of energy supply installations; replacement of batteries.
  • Class 039 — Transportation and storage services: Rental of electricity storage facilities.

Owner

Prosecution history

  • 03 Feb 2026 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 09 Dec 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 09 Dec 2025 — PUBLISHED FOR OPPOSITION
  • 03 Dec 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 07 Nov 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 07 Nov 2025 — EXAMINER'S AMENDMENT ENTERED
  • 07 Nov 2025 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
  • 07 Nov 2025 — EXAMINERS AMENDMENT E-MAILED
  • 07 Nov 2025 — EXAMINERS AMENDMENT -WRITTEN
  • 19 Aug 2025 — ASSIGNED TO EXAMINER
  • 09 May 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 09 May 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 09 May 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 14 Mar 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 14 Mar 2025 — NON-FINAL ACTION E-MAILED

View this trademark record on Marksy