MERITION
Live / Applied — First extension granted (statement of use) (as of 27 Feb 2026)
What this means for you
Not registered yet, but its 02 Sept 2024 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98728979
- Mark type
- Design + words
- Filed
- 02 Sept 2024
- Published for opposition
- 19 Aug 2025
- Attorney of record
- Keith R. Obert
Goods and services
- Class 001 — Chemicals: Electrolyte membranes for fuel cells; electrolyte plates for fuel cells; separation membranes for fuel cells; electrolyte membranes for redox flow batteries; electrolyte plates for redox flow batteries; separation membranes for redox flow batteries; electrolyte membranes for gas separation in water electrolysis; gas separation apparatus for water electrolysis
- Class 009 — Scientific and electric apparatus: Fuel cells
- Class 011 — Environmental control apparatus: gas separation membranes for water electrolysis; hollow-fibre membrane modules being structural parts for gas scrubbing apparatus, as separators for use in plants for gas separation and gas processing; membrane apparatus for generating gas; adsorption apparatus for generating gas; gas scrubbing apparatus; filters being structural parts for gas scrubbing apparatus; air filtering installations; air purifying units for industrial purposes; air filters for industrial purposes; water purification apparatus; water purification filters
- Class 017 — Rubber goods: Semi-processed plastics in the nature of separating materials for use in electrolyte membranes for fuel cells; semi-processed plastics in the nature of separating materials for use in electrolyte membranes for water electrolysis; semi-processed plastics in the nature of separating materials for use in electrolyte membranes for redox flow batteries; semi-processed plastics
Owner
- AIRRANE CO., LTD., Chungcheongbuk-do, KR
- AIRRANE CO., LTD., Chungcheongbuk-do, KR
Prosecution history
- 27 Feb 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 27 Feb 2026 — SOU EXTENSION 1 GRANTED
- 27 Feb 2026 — SOU EXTENSION 1 FILED
- 27 Feb 2026 — SOU TEAS EXTENSION RECEIVED
- 14 Oct 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 19 Aug 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 19 Aug 2025 — PUBLISHED FOR OPPOSITION
- 13 Aug 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 25 Jul 2025 — ON HOLD - ELECTRONIC RECORD REVIEW REQUIRED
- 05 Jul 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 14 Jun 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 13 Jun 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 13 Jun 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 19 Mar 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 19 Mar 2025 — NON-FINAL ACTION E-MAILED