VIRTUAL ENERGY SUPERVISOR

Live / Registered — Registered (as of 25 Nov 2025)

What this means for you

Registered since 25 Nov 2025. The owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
98726036
Registration number
8036810
Mark type
Stylized text
Filed
30 Aug 2024
Published for opposition
07 Oct 2025
Registered
25 Nov 2025
Attorney of record
Dinnatia Doster-Greene

Goods and services

  • Class 009 — Scientific and electric apparatus: Electronic controllers for measuring and controlling power demands in real-time to avoid peak demands of a utility grid; electronic devices for curtailing loads to ensure that the power demands of a utility grid remains below a predetermined threshold; electronic devices for facilitating building-wide load reduction; electronic devices for detecting the need for load shedding of a utility grid, communicating the demand to participating users, and automating the load shedding, kWh-harvesting and verifying compliance with the terms of a Demand Response Program; electronic devices for monitoring and controlling demand loads to prevent an overload of a utility grid; electronic devices for monitoring and comparing actual power usage of a utility grid with target values and for controlling and reducing the load of designated equipment based on assigned priority levels and user parameters
  • Class 035 — Advertising and business services: Electrical load audit services
  • Class 037 — Building construction and repair services: Maintenance of energy systems, namely, intelligent peak load control systems
  • Class 042 — Scientific and technological services: Providing temporary use of non-downloadable computer software for energy usage monitoring, metering, and analysis; Providing temporary use of non-downloadable software for online energy usage management, namely, monitoring of the electrical grid; Providing temporary use of non-downloadable software for measuring and controlling power demands in real-time to avoid peak demands of a utility grid, for curtailing loads to ensure that the power demands of a utility grid remains below a predetermined threshold, for facilitating building-wide load reduction, for detecting the need for load shedding of a utility grid, communicating the demand to participating users, and automating the load shedding, kWh-harvesting and verifying compliance with the terms of a Demand Response Program, for monitoring and controlling demand loads to prevent an overload of a utility grid, for monitoring and comparing actual power usage of a utility grid with target values and for controlling and reducing the load of designated equipment based on assigned priority levels and user parameters

Owner

Prosecution history

  • 25 Nov 2025 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
  • 25 Nov 2025 — REGISTERED-PRINCIPAL REGISTER
  • 07 Oct 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 07 Oct 2025 — PUBLISHED FOR OPPOSITION
  • 01 Oct 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 09 Sept 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 08 Sept 2025 — USE AMENDMENT FILED
  • 08 Sept 2025 — TEAS AMENDMENT OF USE RECEIVED
  • 08 Sept 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 09 Jun 2025 — APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED
  • 09 Jun 2025 — APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED
  • 08 Mar 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 08 Mar 2025 — NON-FINAL ACTION E-MAILED
  • 08 Mar 2025 — NON-FINAL ACTION WRITTEN
  • 05 Mar 2025 — ASSIGNED TO EXAMINER

View this trademark record on Marksy