FAB IN A BOX

Live / Allowed — Notice of allowance issued (as of 30 Sept 2025)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 21 Aug 2024 filing date already counts against anyone who files later.

Record

Serial number
98709147
Mark type
Stylized text
Filed
21 Aug 2024
Published for opposition
10 Jun 2025
Attorney of record
Marek Krizka

Goods and services

  • Class 006 — Metal goods: Boxes of common metal; Building panels of metal; Construction elements made of metal, namely, fabricated metal components for building foundations; Containers of metal for chemicals, compressed gases and liquids; Drain pipes of metal; Ducts and pipes of metal for central heating installations; Ducts of metal for ventilating and air-conditioning installations; Elbows of metal for pipes; Metal boxes; Metal heating ducts; Metal ladders; Metal modular homes comprised of modular metal boxes with piping, ladders, EMT (Electrical Metallic Tubing), and duct; Metal pipe connectors; Metal pipe fittings; Metal pipes and tubes; Metal pipes for liquid and gas transfer; Metal tubing; Metal pre-fabricated stables; Modular metallic buildings; Pre-fabricated metal building assembly kits; Steel pipes; Transportable metal constructions; Valves of metal, other than parts of machines; Ventilating ducts of metal; Water-pipe valves of metal
  • Class 040 — Treatment of materials: Custom 3D printing for others; Custom construction of modular prefabricated enclosure sold as a unit; Custom manufacture of modular components for modular buildings; Metal fabrication and finishing services for others; Metalworking; Printing services; Welding services

Owner

Prosecution history

  • 13 Mar 2026 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
  • 13 Mar 2026 — ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
  • 13 Mar 2026 — TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
  • 30 Sept 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 10 Jun 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 10 Jun 2025 — PUBLISHED FOR OPPOSITION
  • 04 Jun 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 07 May 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 26 Mar 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 26 Mar 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 26 Mar 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 06 Mar 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 06 Mar 2025 — NON-FINAL ACTION E-MAILED
  • 06 Mar 2025 — NON-FINAL ACTION WRITTEN
  • 26 Feb 2025 — ASSIGNED TO EXAMINER

View this trademark record on Marksy