ENGINEERING THE INFRASTRUCTURE OF THE FUTURE

Live / Applied — First extension granted (statement of use) (as of 27 Mar 2026)

What this means for you

Not registered yet, but its 16 Aug 2024 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
98702518
Mark type
Stylized text
Filed
16 Aug 2024
Published for opposition
05 Aug 2025
Attorney of record
Polaphat Veravanich

Goods and services

  • Class 007 — Machines and machine tools: Power supply systems for railway cars comprising auxiliary power units for supplying electrical power
  • Class 009 — Scientific and electric apparatus: High voltge direct current (HVDC) power transmission products for electric power utility systems, namely, high voltage direct current (HVDC) converters, power transformers, gas insulated circuit breakers, vacuum circuit breakers, air insulated switchgear, gas insulated switchgear, flexible AC transmission systems (FACTS), voltage regulators, and volt/var power controls; uninterruptible electrical power supplies for industrial applications; nuclear power plant control systems comprising instrumentation and power controllers and computer network interfaces for monitoring systems; light emitting diode (LED) large-screen displays; power supply systems for railway cars comprising auxiliary power supplies; train control systems comprising electric on-board network controllers, on-board radio transmitter units, wayside radio transmitter units, and electric controllers for wayside equipment
  • Class 011 — Environmental control apparatus: HVAC systems, namely, HVAC units for railway cars
  • Class 012 — Vehicles: Structural parts of railway cars being propulsion systems comprising tractor motors, gear units, gear couplings, and silicon carbide (SiC) semiconductor power modules

Owner

Prosecution history

  • 28 Mar 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 27 Mar 2026 — SOU EXTENSION 1 GRANTED
  • 27 Mar 2026 — SOU EXTENSION 1 FILED
  • 27 Mar 2026 — SOU TEAS EXTENSION RECEIVED
  • 30 Sept 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 05 Aug 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 05 Aug 2025 — PUBLISHED FOR OPPOSITION
  • 30 Jul 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 01 Jul 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 27 Jun 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 27 Jun 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 27 Jun 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 31 Mar 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 31 Mar 2025 — NON-FINAL ACTION E-MAILED
  • 31 Mar 2025 — NON-FINAL ACTION WRITTEN

View this trademark record on Marksy