X-GUARD
Live / Registered — Registered (as of 08 Jul 2025)
What this means for you
Registered since 08 Jul 2025. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98661848
- Registration number
- 7855542
- Mark type
- Stylized text
- Filed
- 23 Jul 2024
- Published for opposition
- 20 May 2025
- Registered
- 08 Jul 2025
- Attorney of record
- Ben Natter
Goods and services
- Class 009 — Scientific and electric apparatus: Cables, electric; Wires, electric; Electric adapter cables; Electrical distribution boxes; Electrical power distribution units; Electric transformers; Pantographs being electric current collectors; Electric connectors; Current rectifiers; Converters, electric; Power inverters; Inverters for power supply; Photovoltaic inverters; Electrical adapters; Electric sensors; Electric junction boxes; Switches, electric; Relays, electric; Remote controls for electric video surveillance installations; Transistors; Accumulators, electric; Rechargeable batteries; Charging appliances for rechargeable equipment; Solar panels for the production of electricity; Photovoltaic systems that convert sunlight into electric and thermal energy; Galvanic batteries; Electric car charging piles; Charging stations for electric vehicles
Owner
- EcoFlow Inc., Shenzhen, Guangdong, CN
- EcoFlow Inc., Shenzhen, Guangdong, CN
- EcoFlow Inc., Shenzhen, Guangdong, CN
Prosecution history
- 08 Jul 2025 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 08 Jul 2025 — REGISTERED-PRINCIPAL REGISTER
- 20 May 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 20 May 2025 — PUBLISHED FOR OPPOSITION
- 14 May 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 16 Apr 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 17 Feb 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 17 Feb 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 17 Feb 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 14 Feb 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 14 Feb 2025 — NON-FINAL ACTION E-MAILED
- 14 Feb 2025 — NON-FINAL ACTION WRITTEN
- 11 Feb 2025 — ASSIGNED TO EXAMINER
- 10 Feb 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 23 Jul 2024 — NEW APPLICATION ENTERED