BAJA ELEVATED SOLAR SUPPORT SYSTEMS

Live / Applied — First extension granted (statement of use) (as of 08 Sept 2026)

What this means for you

Not registered yet, but its 23 Jul 2024 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
98661804
Mark type
Stylized text
Filed
23 Jul 2024
Published for opposition
20 Jan 2026
Attorney of record
Matthew J. Smith

Goods and services

  • Class 006 — Metal goods: Construction elements made of metal, namely, fabricated metal components for building foundations; Construction elements made of metal, namely, supports; Cladding of metal for construction and building; Structure joint connectors of metal; Arbours of metal used as structures; Metal structures for mounting solar panels; Portable buildings made primarily of metal; Portable metal buildings; Arbors of metal; Arbours of metal; Awnings of metal; Beams of metal; Beams of common metal for building; Building boards of metal; Building materials, namely composite panels composed primarily of metal; Building panels of metal; Buildings, transportable, of metal; Ceiling boards of metal; Ceiling panels of metal; Ceiling supports of metal; Coverings of metal for ceilings; Metal beams; Metal pillars for buildings; Metal posts; metal roofing; Metal roofing panels; Metal stanchions; ; Metal storage shelters; Metal storm shelters; Metal supports for use as outdoor post foundations; Prefabricated metal carports for recreational vehicles (RVs), namely, light gauge, pre-galvanized, high-tensile straight steel carport design structures with engineered pier footing foundations; Prefabricated metal carports for recreational vehicles (RVs), namely, light gauge, pre-galvanized, high-tensile straight steel carport design structures with engineered pier footing foundations that mount solar panels
  • Class 037 — Building construction and repair services: Construction consultancy; construction of steel structures; Construction project management services in the field of construction of renewable energy and energy generation equipment support structures and ancillary structures for supporting meteorological data gathering equipment; Construction, repair and maintenance of buildings; Construction, repair and maintenance of buildings, and providing information relating thereto; Building construction; Building construction and repair; Building construction consultancy services; Building construction for civil infrastructure projects; Building construction services; Building construction supervision; Building construction supervision services for building projects; Consultancy services relating to the construction of buildings; Installation and maintenance of solar energy based power plants; Installation of solar energy systems and alternative energy products for residential and commercial use; Installation of utilities in construction sites; Installation, maintenance and repair of solar collectors; Installation, maintenance and repair of solar energy systems; Installation, maintenance and repair of solar installations for generating power; Installation, maintenance and repair of solar installations for generating power, solar collectors and photovoltaic modules; Providing information relating to building construction; Provision of construction advice; Provision of information in relation to building construction; Provision of technical information in the field of building construction; Removal and reinstallation of solar panels; Steel structure construction works; Supervision of building construction; Technical consultation in the field of building construction

Owner

Prosecution history

  • 09 Sept 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 08 Sept 2026 — SOU EXTENSION 1 GRANTED
  • 08 Sept 2026 — SOU EXTENSION 1 FILED
  • 08 Sept 2026 — SOU TEAS EXTENSION RECEIVED
  • 17 Mar 2026 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 20 Jan 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 20 Jan 2026 — PUBLISHED FOR OPPOSITION
  • 14 Jan 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 18 Dec 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 04 Dec 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 04 Dec 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 04 Dec 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 12 Sept 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 12 Sept 2025 — NON-FINAL ACTION E-MAILED
  • 12 Sept 2025 — NON-FINAL ACTION WRITTEN

View this trademark record on Marksy