QMAT
Live / Applied — First extension granted (statement of use) (as of 24 Feb 2026)
What this means for you
Not registered yet, but its 08 Jul 2024 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98636465
- Mark type
- Stylized text
- Filed
- 08 Jul 2024
- Published for opposition
- 01 Jul 2025
- Attorney of record
- Robert H. Newman
Goods and services
- Class 006 — Metal goods: Crane mats in the nature of composite mats composed primarily of metal for use as load support surfaces; crane mats composed primarily of metal for use as load support surfaces in the construction, energy, oil and gas, and utility industries; crane mats for construction in the nature of composite mats composed primarily of metal for use as load support surfaces in the construction, energy, oil and gas, and utility industries; crane mats in the nature of composite mats composed primarily of metal for use as load support surfaces in the construction industry particularly for use in creating temporary roadways, and supporting and stabilizing utility cranes in the utility, energy, oil and gas, and construction industries
- Class 019 — Non-metallic building materials: synthetic non-metal flooring
- Class 020 — Furniture: Work surfaces; work surfaces for construction; crane mats composed primarily of non-metal for use as load support surfaces in the construction, energy, oil and gas, and utility industries; work surfaces, principally of metal, for cranes and other equipment on construction and industrial sites; work surfaces made primarily of wood; work surfaces made primarily of wood for construction; work surfaces, namely, timber mats for use as load support surfaces in the construction, energy, oil and gas, and utility industries; work surfaces, namely, timber mats for cranes and other equipment on construction and industrial sites; work surfaces made primarily of wood for use as load support surfaces in the construction, energy, oil and gas, and utility industries; work surfaces made primarily of wood for cranes and other equipment on construction and industrial sites; work surfaces, namely, non-metal rig mats; work surfaces, namely, non-metal laminated mats
- Class 037 — Building construction and repair services: Rental of construction equipment in the nature of crane mats, timber mats, and work surfaces; rental of construction equipment in the nature of mats and work surfaces for cranes; rental of construction equipment in the nature of crane mats, timber mats, and pads being work surfaces for use in creating temporary roadways, supporting and stabilizing utility trucks, cranes, excavators, vehicles and other heavy equipment in the utility, energy, oil and gas, and construction industries; installation of crane mats, timber mats, and work surfaces for cranes and other equipment on construction and industrial sites; installation of temporary flooring and ground protection coverings; rental of construction equipment in the nature of protective floor coverings; rental of construction equipment in the nature of protective temporary flooring and ground protection coverings; installation of protective coatings for floors in the nature of carpet, turf, vinyl, and custom floor finishes
Owner
- Quality Mat Company, Beaumont, TX, US
- Quality Mat Company, Beaumont, TX, US
Prosecution history
- 24 Feb 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 24 Feb 2026 — SOU EXTENSION 1 GRANTED
- 24 Feb 2026 — SOU EXTENSION 1 FILED
- 24 Feb 2026 — SOU TEAS EXTENSION RECEIVED
- 26 Aug 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 01 Jul 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 01 Jul 2025 — PUBLISHED FOR OPPOSITION
- 25 Jun 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 31 May 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 08 May 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 08 May 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 08 May 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 08 Feb 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 08 Feb 2025 — NON-FINAL ACTION E-MAILED
- 08 Feb 2025 — NON-FINAL ACTION WRITTEN