ROX
Live / Allowed — Notice of allowance issued (as of 28 Oct 2025)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 24 Jun 2024 filing date already counts against anyone who files later.
Record
- Serial number
- 98615048
- Mark type
- Stylized text
- Filed
- 24 Jun 2024
- Published for opposition
- 02 Sept 2025
- Attorney of record
- Jeffrey M. Becker
Goods and services
- Class 007 — Machines and machine tools: Steam reforming machines being industrial chemical reactors for generating hydrogen with low carbon
- Class 011 — Environmental control apparatus: Low-carbon hydrogen production plants; Plants in the field of hydrogen production featuring oxidative reforming and high captured carbon rates; Apparatus and installations for generating hydrogen with low carbon, namely, absorption apparatus for generating hydrogen with low carbon; Apparatus and installations for use in low-carbon hydrogen production plants, namely, oxidative reforming apparatus for generating hydrogen
- Class 037 — Building construction and repair services: Construction of low-carbon hydrogen production plants; Construction of hydrogen production plants having high captured carbon rates; Consulting relating to the construction of hydrogen production plants; Construction, installation, maintenance and repair services for hydrogen production plants and equipment.
- Class 040 — Treatment of materials: Technical consulting services in the field of hydrogen production
- Class 042 — Scientific and technological services: Engineering services in the field of hydrogen production; Design and development of apparatus and installations for generating hydrogen with low carbon; Research and development in the field of apparatus and installations for generating hydrogen with low carbon.
Owner
- Technip Energies France, Nanterre, FR
- Technip Energies France, Nanterre, FR
Prosecution history
- 28 Oct 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 02 Sept 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 02 Sept 2025 — PUBLISHED FOR OPPOSITION
- 27 Aug 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 28 Jul 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 28 Jul 2025 — EXAMINER'S AMENDMENT ENTERED
- 28 Jul 2025 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
- 28 Jul 2025 — EXAMINERS AMENDMENT E-MAILED
- 28 Jul 2025 — EXAMINERS AMENDMENT -WRITTEN
- 20 May 2025 — NOTIFICATION OF FINAL REFUSAL EMAILED
- 20 May 2025 — FINAL REFUSAL E-MAILED
- 20 May 2025 — FINAL REFUSAL WRITTEN
- 17 Apr 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 17 Apr 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 17 Apr 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED