W
Live / Registered — Registered (as of 22 Apr 2025)
What this means for you
Registered since 22 Apr 2025. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98604460
- Registration number
- 7766479
- Mark type
- Design + words
- Filed
- 17 Jun 2024
- Published for opposition
- 04 Mar 2025
- Registered
- 22 Apr 2025
- Attorney of record
- Kristen Noelle Hayes
Goods and services
- Class 037 — Building construction and repair services: Construction project management services; Construction consultation for underground utility infrastructure, including electric power, oil and gas, pipelines, telecommunications, and water, wastewater and sewer infrastructure facilities; Excavation services, including trenching and shoring; Installation of storm drains piping, wastewater piping, and water main piping; Pipe bursting; Inlet construction; Manhole construction; Demolition and construction of asphalt surfaces, concrete sidewalks, curbs, and gutters; Subgrade repair services; Installation and maintenance of construction signs; Installation and maintenance of traffic control equipment and systems
- Class 042 — Scientific and technological services: Consulting in the field of design and engineering of underground utility infrastructure, including telecommunications infrastructure, electric power infrastructure, gas infrastructure, pipelines, and water, wastewater and sewer infrastructure; Inspection services for water and sewer system piping, including locating of underground utility pipes, cables, or wires for preventing damage to underground utilities during excavation; Consulting and technical support services for traffic design integration and traffic planning services
Owner
- WestRock Engineering, San Francisco, CA, US
- WestRock Engineering, San Francisco, CA, US
- WestRock Engineering, San Francisco, CA, US
Prosecution history
- 22 Apr 2025 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 22 Apr 2025 — REGISTERED-PRINCIPAL REGISTER
- 04 Mar 2025 — PUBLISHED FOR OPPOSITION
- 04 Mar 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 26 Feb 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 13 Feb 2025 — ASSIGNED TO LIE
- 11 Feb 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 11 Feb 2025 — EXAMINER'S AMENDMENT ENTERED
- 11 Feb 2025 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
- 11 Feb 2025 — EXAMINERS AMENDMENT E-MAILED
- 11 Feb 2025 — EXAMINERS AMENDMENT -WRITTEN
- 27 Jan 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 27 Jan 2025 — NON-FINAL ACTION E-MAILED
- 27 Jan 2025 — NON-FINAL ACTION WRITTEN
- 08 Jan 2025 — ASSIGNED TO EXAMINER