PSI PROCEGAS

Live / Allowed — Published for opposition (as of 10 Feb 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 10 Jun 2024 filing date already counts against anyone who files later.

Record

Serial number
98594102
Mark type
Design + words
Filed
10 Jun 2024
Published for opposition
10 Feb 2026
Attorney of record
Ricardo Fischer

Goods and services

  • Class 037 — Building construction and repair services: Oil, gas and mining engineering; civil engineering for the construction of infrastructure for drilling and extraction of gas, oil, and minerals; Building construction; Civil engineering construction consultancy; installation of gas, petroleum and oil engineering systems, namely, drilling rigs, derricks, Blowout Preventer (BOP) systems, drill pipes, casings and tubing, oil and gas pipelines, compressor stations, and pumping stations; maintenance of civil engineering structures; power plant, gas, petroleum and oil engineering construction supervision; installation of petroleum, gas and oil refineries; Installation of gas and water pipelines; petroleum and gas extraction; oil and gas drilling; repair and maintenance of gas, oil and petroleum infrastructures; construction of pipelines; maintenance and repair of pipelines; drilling equipment rental; stabilisation of ground by cement injection; cement injection; installation of hydropower systems; solar and wind farms installation and construction; installation of oil and gas production plants

Owner

Prosecution history

  • 10 Feb 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 10 Feb 2026 — PUBLISHED FOR OPPOSITION
  • 04 Feb 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 15 Jan 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 11 Aug 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 11 Aug 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 11 Aug 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 20 Jun 2025 — APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED
  • 20 Jun 2025 — APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED
  • 21 Mar 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 21 Mar 2025 — NON-FINAL ACTION E-MAILED
  • 21 Mar 2025 — NON-FINAL ACTION WRITTEN
  • 30 Dec 2024 — ASSIGNED TO EXAMINER
  • 29 Dec 2024 — NOTICE OF DESIGN SEARCH CODE E-MAILED
  • 29 Dec 2024 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

View this trademark record on Marksy