SCHEBLER
Live / Registered — Registered (as of 03 Jun 2025)
What this means for you
Registered since 03 Jun 2025. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98592649
- Registration number
- 7814697
- Mark type
- Stylized text
- Filed
- 10 Jun 2024
- Published for opposition
- 15 Apr 2025
- Registered
- 03 Jun 2025
- Attorney of record
- Joshua J. McIntyre
Goods and services
- Class 006 — Metal goods: Metal chimneys; metal heating ducts; ventilating ducts of metal; metal grease ducts for ventilation installations, namely, ventilation of grease-laden vapors for use in food service applications.
- Class 037 — Building construction and repair services: Installation, maintenance, and repair of heating, cooling, ventilating, and air-conditioning systems; installation, maintenance, and repair of residential and industrial furnaces; air duct cleaning services; HVAC duct cleaning services.
- Class 040 — Treatment of materials: Metal fabrication and finishing services for others; custom metal fabrication for others; cutting and processing of metal products; welding services.
- Class 042 — Scientific and technological services: Design services for custom engineered venting systems; engineering design services in the field of metal fabrication.
Owner
- THE SCHEBLER CO., BETTENDORF, IA, US
- THE SCHEBLER CO., BETTENDORF, IA, US
- THE SCHEBLER CO., BETTENDORF, IA, US
Prosecution history
- 03 Jun 2025 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 03 Jun 2025 — REGISTERED-PRINCIPAL REGISTER
- 15 Apr 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 15 Apr 2025 — PUBLISHED FOR OPPOSITION
- 09 Apr 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 17 Mar 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 05 Mar 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 05 Mar 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 05 Mar 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 25 Dec 2024 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 25 Dec 2024 — NON-FINAL ACTION E-MAILED
- 25 Dec 2024 — NON-FINAL ACTION WRITTEN
- 25 Dec 2024 — ASSIGNED TO EXAMINER
- 23 Dec 2024 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 10 Jun 2024 — NEW APPLICATION ENTERED