REWAY

Live / Applied — First extension granted (statement of use) (as of 09 Feb 2026)

What this means for you

Not registered yet, but its 03 Jun 2024 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
98581964
Mark type
Stylized text
Filed
03 Jun 2024
Published for opposition
22 Jul 2025
Attorney of record
Gregg A. Paradise

Goods and services

  • Class 006 — Metal goods: Metal ramps for vehicles; Anchor bolts of metal; Metal parking curbs
  • Class 019 — Non-metallic building materials: materials and components for improvements to existing and new roads, sidewalks, and plazas, namely, non-metal parking curbs, cement slabs, concrete panels, concrete bollards, gratings not of metal for ventilation openings, pavement tiles, non-metal catch basins for attachment to sewer pipes to trap debris, non-metal barricades in the nature of planters, non-metal access panels, weather barriers in the nature of concrete walls, nonskid floors not of metal, permeable pavement, namely, asphalt paving compositions, safety islands in the nature of cement curbs, and non-metal speed bumps
  • Class 037 — Building construction and repair services: Construction of roads, sidewalks, and plazas; Consulting in the field of street, plaza and open space construction and engineering

Owner

Prosecution history

  • 10 Feb 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 09 Feb 2026 — SOU EXTENSION 1 GRANTED
  • 09 Feb 2026 — SOU EXTENSION 1 FILED
  • 09 Feb 2026 — SOU TEAS EXTENSION RECEIVED
  • 16 Sept 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 22 Jul 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 22 Jul 2025 — PUBLISHED FOR OPPOSITION
  • 16 Jul 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 18 Jun 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 17 Jun 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 17 Jun 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 17 Jun 2025 — TEAS REQUEST FOR RECONSIDERATION RECEIVED
  • 18 Mar 2025 — NOTIFICATION OF FINAL REFUSAL EMAILED
  • 18 Mar 2025 — FINAL REFUSAL E-MAILED
  • 18 Mar 2025 — FINAL REFUSAL WRITTEN

View this trademark record on Marksy