EF BUS

Live / Allowed — Notice of allowance issued (as of 25 Aug 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 28 May 2024 filing date already counts against anyone who files later.

Record

Serial number
98571240
Mark type
Stylized text
Filed
28 May 2024
Published for opposition
30 Jun 2026
Attorney of record
Ben Natter

Goods and services

  • Class 009 — Scientific and electric apparatus: Networking devices, namely, computer network interface devices, network routers; Network controlling apparatus, namely, ethernet controllers; controller area network devices, electronic network controllers; Electronic control units; devices for connecting electronic control units, Electric current sensors; Downloadable software for operating and decoding sensor readings; Downloadable software for the conduction, distribution, conversion, storage, regulation and management of electricity; downloadable Application software for the conduction, distribution, conversion, storage, regulation and management of electricity; Sensors and detectors, namely, electronic sensors for detecting electricity for the conduction, distribution, conversion, storage, regulation and management of electricity; Wireless controllers to remotely monitor and control the function and status of other electrical, electronic, and mechanical devices or systems; monitoring apparatus, namely, monitoring apparatus for the conduction, distribution, conversion, storage, regulation and management of electricity; downloadable software for remote diagnostics; panels and system monitoring devices for monitoring the conduction, distribution, conversion, storage, regulation and management of electricity, electric cables; interface cables; communication system comprising USB hardware, USB cables, and downloadable USB operating software designed to transfer data between components inside a computer and between computers though the conduction, distribution, conversion, storage, regulation and management of electricity; Batteries; Solar-powered rechargeable batteries; Inverters for power supply; Power distributing boxes.

Owner

Prior registrations

Prosecution history

  • 09 Sept 2026 — TEAS STATEMENT OF USE RECEIVED
  • 25 Aug 2026 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 30 Jun 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 30 Jun 2026 — PUBLISHED FOR OPPOSITION
  • 24 Jun 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 04 Jun 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 23 May 2026 — SUSPENSION CHECKED - TO ATTORNEY FOR ACTION
  • 26 Aug 2025 — REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
  • 25 Aug 2025 — REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
  • 24 Feb 2025 — NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
  • 24 Feb 2025 — LETTER OF SUSPENSION E-MAILED
  • 24 Feb 2025 — SUSPENSION LETTER WRITTEN
  • 20 Feb 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 19 Feb 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 19 Feb 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED

View this trademark record on Marksy