FRONTLINE CONSTRUCTION TECHNOLOGIES
Live / Registered — Registered (as of 18 Feb 2025)
What this means for you
Registered since 18 Feb 2025. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98548001
- Registration number
- 7694820
- Mark type
- Stylized text
- Filed
- 13 May 2024
- Published for opposition
- 31 Dec 2024
- Registered
- 18 Feb 2025
- Attorney of record
- C. Blair Barbieri
Goods and services
- Class 037 — Building construction and repair services: Building construction services; Construction of commercial buildings, industrial plants, utilities, railroads, highways, bridges, mechanical installations and mining facilities to the order and specification of others; Construction services using advanced and innovative digital and physical construction technologies, namely, drones, laser scanning technologies, virtual and augmented reality technologies, prefabrication technologies, robotics, computer-aided custom-built component parts of building and construction materials, material and manufacturing innovations, aerial photographs, thermal analysis, video documentation, test and inspection software applications, commissioning software applications, equipment start-up, testing, inspection, commissioning and tracking software applications, concrete mix design tracking and documentation software applications, jobsite personnel work-shift tracking and activity logging software applications, such technologies for use in the construction of commercial buildings, industrial plants, utilities, railroads, highways, bridges, mechanical installations and mining facilities.
Owner
- The Sundt Companies, Inc., Tempe, AZ, US
- The Sundt Companies, Inc., Tempe, AZ, US
- The Sundt Companies, Inc., Tempe, AZ, US
Prosecution history
- 04 Jun 2025 — TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS
- 04 Jun 2025 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
- 04 Jun 2025 — ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
- 04 Jun 2025 — TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
- 18 Feb 2025 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 18 Feb 2025 — REGISTERED-PRINCIPAL REGISTER
- 31 Dec 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 31 Dec 2024 — PUBLISHED FOR OPPOSITION
- 25 Dec 2024 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 04 Dec 2024 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 04 Dec 2024 — EXAMINER'S AMENDMENT ENTERED
- 04 Dec 2024 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
- 04 Dec 2024 — EXAMINERS AMENDMENT E-MAILED
- 04 Dec 2024 — EXAMINERS AMENDMENT -WRITTEN
- 26 Nov 2024 — ASSIGNED TO EXAMINER