SEANEST
Live / Allowed — Notice of allowance issued (as of 14 Oct 2025)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 30 Apr 2024 filing date already counts against anyone who files later.
Record
- Serial number
- 98527435
- Mark type
- Stylized text
- Filed
- 30 Apr 2024
- Published for opposition
- 19 Aug 2025
- Attorney of record
- John Brent Moetteli
Goods and services
- Class 006 — Metal goods: Metal materials for construction, namely, metal trusses, metal buoys, metal piles; transportable buildings of metal; metal containers for storage or transport; metal platform components, namely, modular construction elements to be assembled to form metal platforms; floating metal platform components, namely, modular construction elements to be assembled to form floating metal platforms; metal bridge components, namely, modular construction elements to be assembled to form metal bridges; floating metal docks
- Class 012 — Vehicles: Water vehicles, namely, barges; apparatus for locomotion on water, namely, pontoons, house boats, barges
- Class 019 — Non-metallic building materials: Flooring materials, not of metal, for construction; rigid pipes, not of metal, for building; transportable buildings, not of metal; monuments, not of metal; podium platform components, not of metal, namely, modular construction elements to be assembled to form podium platforms, not of metal; floating platform components, not of metal, namely, modular construction elements to be assembled to form floating platforms, not of metal; bridge components not of metal, namely, modular construction elements to be assembled to form bridges, not of metal; floating docks, not of metal
Owner
- Legacy Foundry AG, Feusisberg, CH
- Legacy Foundry AG, Feusisberg, CH
Prosecution history
- 14 Oct 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 19 Aug 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 19 Aug 2025 — PUBLISHED FOR OPPOSITION
- 13 Aug 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 10 Jul 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 03 Jul 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 03 Jul 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 03 Jul 2025 — TEAS REQUEST FOR RECONSIDERATION RECEIVED
- 15 Apr 2025 — NOTIFICATION OF FINAL REFUSAL EMAILED
- 15 Apr 2025 — FINAL REFUSAL E-MAILED
- 15 Apr 2025 — FINAL REFUSAL WRITTEN
- 19 Feb 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 19 Feb 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 19 Feb 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 20 Nov 2024 — NOTIFICATION OF NON-FINAL ACTION E-MAILED