BRADEN START WITH SAFETY
Live / Applied — Second extension granted (statement of use) (as of 22 Dec 2025)
What this means for you
Not registered yet, but its 27 Mar 2024 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98470016
- Mark type
- Design + words
- Filed
- 27 Mar 2024
- Published for opposition
- 19 Nov 2024
- Attorney of record
- Alicia Morris Groos
Goods and services
- Class 007 — Machines and machine tools: Supply structural parts and auxiliary components for power generation gas turbines, namely, exhaust silencing, diverter dampers, and emission reduction systems comprised of free-standing or structurally supported exhaust stacks being industrial plant exhaust pipes, emission reduction units and silencer baffles and panels for use in industrial plants.
- Class 011 — Environmental control apparatus: Inlet air treatment systems comprised of filter houses, filter modules and cartridges; air duct isolation systems comprised of flap and guillotine type isolators, ventilation louvre dampers.
- Class 037 — Building construction and repair services: Construction management pertaining to auxiliary components for power generation gas turbines, namely, exhaust and silencing systems, inlet air treatment systems, duct isolation systems, diverter dampers and emission reduction systems; servicing of auxiliary components for power generation gas turbines, namely, repair and maintenance of exhaust and silencing systems, inlet air treatment systems, duct isolation systems, diverter dampers and emission reduction systems
- Class 042 — Scientific and technological services: design and engineering of auxiliary components for power generation gas turbines, namely, exhaust and silencing systems, inlet air treatment systems, duct isolation systems, diverter dampers and emission reduction systems
Owner
- Braden Group B.V., Heerlen, NL
- Braden Group B.V., Heerlen, NL
Prosecution history
- 23 Dec 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 22 Dec 2025 — SOU EXTENSION 2 GRANTED
- 22 Dec 2025 — SOU EXTENSION 2 FILED
- 22 Dec 2025 — SOU TEAS EXTENSION RECEIVED
- 01 Jul 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 30 Jun 2025 — SOU EXTENSION 1 GRANTED
- 30 Jun 2025 — SOU EXTENSION 1 FILED
- 30 Jun 2025 — SOU TEAS EXTENSION RECEIVED
- 31 Dec 2024 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 19 Nov 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 19 Nov 2024 — PUBLISHED FOR OPPOSITION
- 13 Nov 2024 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 08 Oct 2024 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 07 Oct 2024 — ASSIGNED TO EXAMINER
- 28 Aug 2024 — NOTICE OF DESIGN SEARCH CODE E-MAILED