TEXASUN
Live / Applied — First extension granted (statement of use) (as of 09 Dec 2025)
What this means for you
Not registered yet, but its 20 Mar 2024 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98459773
- Mark type
- Stylized text
- Filed
- 20 Mar 2024
- Published for opposition
- 15 Apr 2025
- Attorney of record
- Patchen M. Haggerty
Goods and services
- Class 004 — Lubricants and fuels: Electrical energy; electrical energy from solar power
- Class 006 — Metal goods: Substrates primarily of metal for supporting solar cells, photovoltaic cells and solar collectors; building materials of metal for mounting solar cells, photovoltaic cells and solar collectors, namely, metal structures for mounting solar panels, photovoltaic cells and solar collectors; mounting frames of metal for solar cells, photovoltaic cells and solar collectors; aluminum and aluminum alloy building materials for mounting solar cells, photovoltaic cells and solar collectors, namely, metal structures for mounting solar panels, photovoltaic cells and solar collectors; building materials of metal, namely, structural frames being frames of metal for building; building materials of aluminum and aluminum alloy, namely, structural frames being frames of metal for building; solar roof tiles and slates for electricity generation, namely, photovoltaic roofing tiles of metal
- Class 009 — Scientific and electric apparatus: Photovoltaic cells; photovoltaic modules; photovoltaic solar panels for the production of electricity; solar panels for the production of electricity; photovoltaic systems that convert sunlight into electric and thermal energy; photovoltaic apparatus and installations for generating and storing solar electricity, namely, photovoltaic cells and modules; electrical storage batteries; solar-powered rechargeable batteries; solar battery chargers
- Class 019 — Non-metallic building materials: Solar roof tiles and slates for electricity generation, namely, non-metallic photovoltaic roofing tiles
- Class 037 — Building construction and repair services: Installation and maintenance of solar energy systems; installation of photovoltaic cells and modules; installation and maintenance of solar energy based power plants; construction of power plants, namely, solar power plants; electrical contracting for maintenance and repair of solar energy systems; technical services, namely, technical consulting in the fields of constructing, installation of, maintaining, and repairing solar energy systems and solar energy equipment
- Class 039 — Transportation and storage services: Distribution of energy; distribution of renewable energy; storage of electricity; storage of electric energy; Storage of electricity using battery energy storage facilities connected to solar installations
- Class 040 — Treatment of materials: Generation of electricity from solar energy; generation of energy; technical consultation in the field of production of solar energy; Technical services, namely, technical consulting in the fields of monitoring, operating, controlling solar energy systems, solar energy equipment, and energy storage equipment
- Class 042 — Scientific and technological services: Product design and development in the field of photovoltaic energy systems; design of solar energy systems; design and development of energy generation and storage systems; research and development in the field of photovoltaic solar energy; technical consulting in the fields of monitoring solar energy systems, solar energy equipment and energy storage equipment to ensure proper functioning
Owner
- Yingli Electronic Technology USA Inc., Allen, TX, US
- Yingli Electronic Technology USA Inc., Allen, TX, US
Prosecution history
- 09 Dec 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 09 Dec 2025 — SOU EXTENSION 1 GRANTED
- 08 Dec 2025 — SOU EXTENSION 1 FILED
- 08 Dec 2025 — SOU TEAS EXTENSION RECEIVED
- 10 Jun 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 15 Apr 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 15 Apr 2025 — PUBLISHED FOR OPPOSITION
- 09 Apr 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 17 Mar 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 20 Nov 2024 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 20 Nov 2024 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 20 Nov 2024 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 29 Sept 2024 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 29 Sept 2024 — NON-FINAL ACTION E-MAILED
- 29 Sept 2024 — NON-FINAL ACTION WRITTEN