Live / Applied — First extension granted (statement of use) (as of 07 Nov 2025)
What this means for you
Not registered yet, but its 05 Mar 2024 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98433505
- Mark type
- Stylized text
- Filed
- 05 Mar 2024
- Published for opposition
- 18 Mar 2025
- Attorney of record
- Kristin S. Cornuelle
Goods and services
- Class 040 — Treatment of materials: Production and generation of electricity, power and energy; Production of energy, renewable energy, clean energy, wind energy and solar energy; Providing information in the field of energy and electricity production; Non-regulated utility services in the nature of power generation; Generation of power for heating and cooling of buildings through the operation of power generation equipment and facilities; Generation of energy, solar energy, renewable energy, clean energy, wind energy, clean energy production from hydrogen and generation of energy from desalination of water, generation of clean electricity, carbon electricity, and electron volt energy; production of low carbon fuels, zero carbon fuels, zero carbon gasoline, and liquid fuels for others; Waste-to-energy generation services; Consulting in the field of energy generation and production; Generation of electricity from geothermal energy, hydroelectric energy, natural gas energy, diesel energy, wind energy and solar energy; Carbon capture for others using direct air capture technology; Desalination of water; Water recycling and desalination services
Owner
- INTERSECT USA, LLC, BEAVERTON, OR, US
- Intersect Power, LLC, Beaverton, OR, US
- Intersect Power, LLC, Beaverton, OR, US
Prosecution history
- 04 Feb 2026 — AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP
- 07 Nov 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 07 Nov 2025 — SOU EXTENSION 1 GRANTED
- 07 Nov 2025 — SOU EXTENSION 1 FILED
- 07 Nov 2025 — SOU TEAS EXTENSION RECEIVED
- 13 May 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 18 Mar 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 18 Mar 2025 — PUBLISHED FOR OPPOSITION
- 12 Mar 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 24 Feb 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 21 Feb 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 21 Feb 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 21 Feb 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 19 Dec 2024 — APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED
- 19 Dec 2024 — APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED