MAX
Live / Applied — Second extension granted (statement of use) (as of 24 Feb 2026)
What this means for you
Not registered yet, but its 23 Feb 2024 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98418672
- Mark type
- Stylized text
- Filed
- 23 Feb 2024
- Published for opposition
- 31 Dec 2024
- Attorney of record
- Bassam N. Ibrahim
Goods and services
- Class 007 — Machines and machine tools: Industrial robots; Industrial robots for installing solar panels; Industrial robots for assisting in construction of renewable energy construction projects; Autonomous industrial robots for assisting in construction of renewable energy construction projects
- Class 009 — Scientific and electric apparatus: Downloadable and recorded software for managing, optimizing, monitoring, and operating industrial robots in the field of renewable energy; Downloadable and recorded software for accessing data, analytics, and insights in the field of construction project management for renewable energy construction projects
- Class 037 — Building construction and repair services: Rental of industrial robots for installing solar panels; Rental of industrial robots for assisting in construction of renewable energy construction projects; Installation, maintenance and repair of industrial robots; Robot-assisted building construction services and installation of renewable energy generation equipment for renewable energy construction projects
- Class 042 — Scientific and technological services: Design and development of software for controlling robots; Design and development of industrial robots; Providing online non-downloadable software for managing, optimizing, monitoring and operating industrial robots in the field of renewable energy; Providing online non-downloadable software for controlling navigation of industrial robots in the field of renewable energy; Providing online non-downloadable software for accessing data, analytics, and insights in the field of construction project management for renewable energy construction projects
Owner
- AES Next Solar, LLC, Arlington, VA, US
- AES Next Solar, LLC, Arlington, VA, US
Prosecution history
- 25 Feb 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 24 Feb 2026 — SOU EXTENSION 2 GRANTED
- 24 Feb 2026 — SOU EXTENSION 2 FILED
- 24 Feb 2026 — SOU TEAS EXTENSION RECEIVED
- 28 Jul 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 28 Jul 2025 — SOU EXTENSION 1 GRANTED
- 28 Jul 2025 — SOU EXTENSION 1 FILED
- 28 Jul 2025 — SOU TEAS EXTENSION RECEIVED
- 25 Feb 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 31 Dec 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 31 Dec 2024 — PUBLISHED FOR OPPOSITION
- 25 Dec 2024 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 03 Dec 2024 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 03 Dec 2024 — EXAMINER'S AMENDMENT ENTERED
- 03 Dec 2024 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED