THINK POWER SOLUTIONS
Live / Registered — Registered (as of 07 Oct 2025)
What this means for you
Registered since 07 Oct 2025. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98403710
- Registration number
- 7977883
- Mark type
- Design + words
- Filed
- 13 Feb 2024
- Published for opposition
- 15 Oct 2024
- Registered
- 07 Oct 2025
- Attorney of record
- Peter A. Chiabotti
Goods and services
- Class 037 — Building construction and repair services: Plant construction and construction project management services for businesses in the energy production and transmission sector and telecom sector; Construction project management services in the field of construction of energy generation and transmission equipment and telecom infrastructure equipment; Inspection services in the course of construction of power substations, transmission lines and distribution equipment; Construction project management services in the field of critical infrastructure industries
- Class 042 — Scientific and technological services: Consulting services in the field of utility, energy, and critical infrastructure design and development; Technical consultation in the field of environmental engineering and design engineering in the energy, power, utility and critical infrastructure industries; consultancy relating to inspection of manufacturing plants for quality control purposes; Consulting services for others in the field of design, planning, and implementation project management of critical infrastructure industries
Owner
- Think Power Solutions, LLC, Dallas, TX, US
- Think Power Solutions, LLC, Dallas, TX, US
- Think Power Solutions, LLC, Dallas, TX, US
Prior registrations
Prosecution history
- 07 Oct 2025 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 07 Oct 2025 — REGISTERED-PRINCIPAL REGISTER
- 03 Oct 2025 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 15 Sept 2025 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 15 Sept 2025 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 15 Aug 2025 — STATEMENT OF USE PROCESSING COMPLETE
- 02 Dec 2024 — USE AMENDMENT FILED
- 13 Aug 2025 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 02 Dec 2024 — TEAS STATEMENT OF USE RECEIVED
- 26 Nov 2024 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 15 Oct 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 15 Oct 2024 — PUBLISHED FOR OPPOSITION
- 25 Sept 2024 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 10 Sept 2024 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 09 Sept 2024 — TEAS/EMAIL CORRESPONDENCE ENTERED