MODULINQ
Live / Allowed — Notice of allowance issued (as of 11 Nov 2025)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 09 Feb 2024 filing date already counts against anyone who files later.
Record
- Serial number
- 98399150
- Mark type
- Stylized text
- Filed
- 09 Feb 2024
- Published for opposition
- 16 Sept 2025
- Attorney of record
- Marina F. Cunningham
Goods and services
- Class 006 — Metal goods: Connectors of metal, namely, metal connectors for pipes and tubes, structural joint connectors of metal; Manifolds of metal, namely, metal manifolds for use with heat pump systems; None of the aforementioned products intended to be used for modular building units or building constructions in a modular construction system
- Class 007 — Machines and machine tools: Compressors, namely, electric compressors, compressors for machines, compressors for heat pump systems; Pressure switches as part of machines; Heat exchangers being parts of machines; None of the aforementioned products intended to be used for modular building units or building constructions in a modular construction system
- Class 009 — Scientific and electric apparatus: Sensors, namely, temperature sensors, electric sensors; Expansion valves for fluid control; None of the aforementioned products intended to be used for modular building units or building constructions in a modular construction system
- Class 011 — Environmental control apparatus: HVAC systems in the nature of HVAC units; parts of HVAC systems, namely, component parts for HVAC units; heat pumps; Parts for heat pumps; heat exchangers not being parts of machines; filter driers, namely, commercial filter driers for refrigeration and air conditioning installations; expansion valves, in the nature of thermostatic valves as parts of heating installations; None of the aforementioned products intended to be used for modular building units or building constructions in a modular construction system
Owner
- Danfoss A/S, Nordborg, DK
- Danfoss A/S, Nordborg, DK
Prosecution history
- 04 Feb 2026 — TEAS DELETE 1(B) BASIS RECEIVED
- 11 Nov 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 16 Sept 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 16 Sept 2025 — PUBLISHED FOR OPPOSITION
- 10 Sept 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 15 Aug 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 12 Jun 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 12 Jun 2025 — NON-FINAL ACTION E-MAILED
- 12 Jun 2025 — NON-FINAL ACTION WRITTEN
- 03 Apr 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 03 Apr 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 03 Apr 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 08 Jan 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 08 Jan 2025 — NON-FINAL ACTION E-MAILED
- 08 Jan 2025 — NON-FINAL ACTION WRITTEN