AGOSTINO UTILITIES
Live / Registered — Registered (as of 03 Jun 2025)
What this means for you
Registered since 03 Jun 2025. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98373917
- Registration number
- 7814143
- Mark type
- Stylized text
- Filed
- 24 Jan 2024
- Published for opposition
- 15 Apr 2025
- Registered
- 03 Jun 2025
- Attorney of record
- Frank A. Mazzeo
Goods and services
- Class 019 — Non-metallic building materials: Non-metal utility poles
- Class 037 — Building construction and repair services: Installation of non-metal utility poles; Installation, maintenance and repair of power generating apparatus; Maintenance, servicing and repair of power generating apparatus and installations; Providing information related to the installation, maintenance and repair of electrical systems; Providing information relating to the repair or maintenance of electric lighting apparatus; Rental of construction and building equipment; Rental of earth moving equipment and excavators; Rental of lifting apparatus for use in construction; Rental of pneumatic or hydraulic machines, tools and apparatus for use in construction; Repair of power lines; Repair or maintenance of power distribution or control machines and apparatus
Owner
- Agostino Utilities LLC, Schwenksville, PA, US
- Agostino Utilities LLC, Schwenksville, PA, US
- Agostino Utilities LLC, Schwenksville, PA, US
Prosecution history
- 03 Jun 2025 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 03 Jun 2025 — REGISTERED-PRINCIPAL REGISTER
- 15 Apr 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 15 Apr 2025 — PUBLISHED FOR OPPOSITION
- 09 Apr 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 20 Mar 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 21 Feb 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 21 Feb 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 21 Feb 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 18 Nov 2024 — APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED
- 18 Nov 2024 — APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED
- 21 Aug 2024 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 21 Aug 2024 — NON-FINAL ACTION E-MAILED
- 21 Aug 2024 — NON-FINAL ACTION WRITTEN
- 20 Aug 2024 — ASSIGNED TO EXAMINER