PACE

Live / Applied — Second extension granted (statement of use) (as of 02 Mar 2026)

What this means for you

Not registered yet, but its 22 Jan 2024 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
98368547
Mark type
Design + words
Filed
22 Jan 2024
Published for opposition
07 Jan 2025
Attorney of record
Michael W. Rafter

Goods and services

  • Class 007 — Machines and machine tools: Rotary power-operated saws for cutting unhardened concrete and structural parts and fittings therefor; power-driven wall saws and structural parts and fittings therefor; power-driven wire saws and structural parts and fittings therefor; power-driven floor saws and structural parts and fittings therefor; power-driven flat saws and structural parts and fittings therefor; power-driven tile and masonry saws and structural parts and fittings therefor; power-operated core drilling machines and structural parts and fittings therefor; power-driven surface and floor grinding machines for use on concrete, natural stone, terrazzo, concrete overlays and cementitious toppings; power driven surface and floor polishing machines for use on concrete, natural stone, terrazzo, concrete overlays and cementitious toppings; power-operated slurry vacuums, power-operated air scrubbers, power operated dust pre-separators, dust and slurry machines for cleaning purposes; power-operated concrete vibrators for industrial purposes; power-operated trowels; waste, asphalt and soil compactors; ground surface finishing and compacting machines; power driven screeders, namely, machines used for leveling surfaces; power concrete screeders; remote demolition wrecking machines and structural parts and fittings therefor; walk-behind floor scarifier; all of the foregoing in the field of construction
  • Class 009 — Scientific and electric apparatus: Power packs, namely, battery packs; all of the foregoing in the field of construction

Owner

Prosecution history

  • 03 Mar 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 02 Mar 2026 — SOU EXTENSION 2 GRANTED
  • 02 Mar 2026 — SOU EXTENSION 2 FILED
  • 02 Mar 2026 — SOU TEAS EXTENSION RECEIVED
  • 15 Sept 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 29 Aug 2025 — SOU EXTENSION 1 GRANTED
  • 29 Aug 2025 — SOU EXTENSION 1 FILED
  • 29 Aug 2025 — SOU TEAS EXTENSION RECEIVED
  • 04 Mar 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 07 Jan 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 07 Jan 2025 — PUBLISHED FOR OPPOSITION
  • 01 Jan 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 11 Dec 2024 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 09 Dec 2024 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 09 Dec 2024 — CORRESPONDENCE RECEIVED IN LAW OFFICE

View this trademark record on Marksy