MADE TO GO BEYOND

Live / Applied — Second extension granted (statement of use) (as of 01 Apr 2026)

What this means for you

Not registered yet, but its 21 Dec 2023 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
98327156
Mark type
Stylized text
Filed
21 Dec 2023
Published for opposition
04 Feb 2025
Attorney of record
Charles G. Zug

Goods and services

  • Class 009 — Scientific and electric apparatus: Flame resistant fabrics sold as an integral component of finished clothing for protection against accident or injury; Flame resistant fabrics sold as an integral component of finished headwear for protection against accident or injury
  • Class 024 — Fabrics: Knitted fabrics; Woven fabrics; Non-woven fabrics; Synthetic fibre fabrics; Fabrics for the manufacture of clothing; Fabrics for the manufacture of headwear; Fabrics for the manufacture of footwear; Fabrics for the manufacture of blankets; Fabrics for the manufacture of bed linen; Bed linen; Fabric sold as an integral component of bed linen; Fleece blankets; Fabric sold as an integral component of fleece blankets
  • Class 025 — Clothing: Fabric sold as an integral component of finished clothing items, namely, jackets, anoraks, coats, rainwear, vests, shirts, pullovers, hoodies, tops as clothing, pants, shorts, leggings, bottoms as clothing, base layers, underclothes, one-piece garments for children, gloves, mittens, earbands, headbands, neckwear, balaclavas, socks; Fabric sold as an integral component of finished headwear; Fabric sold as an integral component of finished footwear; Clothing, namely, jackets, anoraks, coats, rainwear, vests, shirts, pullovers, hoodies, tops as clothing, pants, shorts, leggings, bottoms as clothing, base layers, underclothes, one-piece garments for children, gloves, mittens, earbands, headbands, neckwear, balaclavas, socks; Headwear; Footwear

Owner

Prosecution history

  • 02 Apr 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 01 Apr 2026 — SOU EXTENSION 2 GRANTED
  • 01 Apr 2026 — SOU EXTENSION 2 FILED
  • 01 Apr 2026 — SOU TEAS EXTENSION RECEIVED
  • 02 Oct 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 01 Oct 2025 — SOU EXTENSION 1 GRANTED
  • 01 Oct 2025 — SOU EXTENSION 1 FILED
  • 01 Oct 2025 — SOU TEAS EXTENSION RECEIVED
  • 01 Apr 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 04 Feb 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 04 Feb 2025 — PUBLISHED FOR OPPOSITION
  • 29 Jan 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 14 Jan 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 05 Nov 2024 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 05 Nov 2024 — CORRESPONDENCE RECEIVED IN LAW OFFICE

View this trademark record on Marksy