RLS CERTIFIED REAL LIFE SITUATIONS
Live / Applied — Second extension granted (statement of use) (as of 29 Sept 2025)
What this means for you
Not registered yet, but its 09 Dec 2023 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98306840
- Mark type
- Design + words
- Filed
- 09 Dec 2023
- Published for opposition
- 10 Sept 2024
- Attorney of record
- Dean G. Stathakis
Goods and services
- Class 037 — Building construction and repair services: Construction consulting and installation services of building structures that provide resistant against blast, ballistic, forced entry and natural disasters in the nature of earthquakes, fire, and high winds; construction consulting and installation services of pre-cast and modular blocks, boards, panels, walls, gates, doors, perimeters and barriers, and structural security systems thereof, and structural security systems thereof, that provide resistant against blast, ballistic, forced entry and natural disasters in the nature of earthquakes, fire, and high winds; construction consulting and installation services of ballistic-, blast-, and fire-resistant blocks, panels, walls, gates, doors, perimeters and barriers, and structural security systems
- Class 042 — Scientific and technological services: Product quality testing; product quality evaluation; quality control of goods and services; providing quality assurance services in the field of construction; testing, analysis, and evaluation of ballistic-, blast-, and fire-resistant building materials to assure compliance with construction industry standards
Owner
- 3B PROTECTION INTERNATIONAL. INC., TEQUESTA, FL, US
- 3B Production, Inc., Irvine, CA, US
- 3B Production, Inc., Irvine, CA, US
Prosecution history
- 30 Sept 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 29 Sept 2025 — SOU EXTENSION 2 GRANTED
- 29 Sept 2025 — SOU EXTENSION 2 FILED
- 29 Sept 2025 — SOU TEAS EXTENSION RECEIVED
- 03 May 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 02 May 2025 — SOU EXTENSION 1 GRANTED
- 02 May 2025 — SOU EXTENSION 1 FILED
- 02 May 2025 — SOU TEAS EXTENSION RECEIVED
- 16 Apr 2025 — AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP
- 05 Nov 2024 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 21 Oct 2024 — POST PUBLICATION AMENDMENT – NOT ENTERED
- 21 Oct 2024 — ASSIGNED TO PETITION STAFF
- 30 Sept 2024 — TEAS POST PUBLICATION AMENDMENT RECEIVED
- 10 Sept 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 10 Sept 2024 — PUBLISHED FOR OPPOSITION