OZOP ENERGY SOLUTIONS POWER CONVERSION TECHNOLOGIES INC.
Live / Applied — Third extension granted (statement of use) (as of 17 Mar 2026)
What this means for you
Not registered yet, but its 02 Nov 2023 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98252977
- Mark type
- Design + words
- Filed
- 02 Nov 2023
- Published for opposition
- 23 Jul 2024
- Attorney of record
- /Michael E Zall/
Goods and services
- Class 009 — Scientific and electric apparatus: ultra-high-power battery chargers, inverters, and power supplies for use in defense, heavy industrial, aircraft ground support, and maritime sectors; electric control devices for energy management; electric control module for energy management in a building; electricity router for managing and optimizing energy loads within a building; electric control module for energy management; electric control module for energy management in a building including a light detector to detect the indoor lighting level and an occupancy sensor to determine occupancy level; modular charging stations to supply electric power to electric vehicles and electric bicycles; modular charging stations to supply electric power to electric vehicles; downloadable software in the nature of a mobile application for monitoring electricity; downloadable software in the nature of a mobile application for monitoring electric charge in mobile electric storage vehicles and charging stations for electric vehicles
Owner
- OZOP Energy Systems, Inc., Warwick, NY, US
- OZOP Energy Systems, Inc., Warwick, NY, US
Prosecution history
- 17 Mar 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 17 Mar 2026 — SOU EXTENSION 3 GRANTED
- 16 Mar 2026 — SOU EXTENSION 3 FILED
- 16 Mar 2026 — SOU TEAS EXTENSION RECEIVED
- 15 Sept 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 15 Sept 2025 — SOU EXTENSION 2 GRANTED
- 14 Sept 2025 — SOU EXTENSION 2 FILED
- 14 Sept 2025 — SOU TEAS EXTENSION RECEIVED
- 14 Mar 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 14 Mar 2025 — SOU EXTENSION 1 GRANTED
- 14 Mar 2025 — SOU EXTENSION 1 FILED
- 14 Mar 2025 — SOU TEAS EXTENSION RECEIVED
- 17 Sept 2024 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 23 Jul 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 23 Jul 2024 — PUBLISHED FOR OPPOSITION