ENODA PRIME
Live / Registered — Registered (as of 01 Jul 2025)
What this means for you
Registered since 01 Jul 2025. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98252475
- Registration number
- 7847067
- Mark type
- Stylized text
- Filed
- 02 Nov 2023
- Published for opposition
- 26 Nov 2024
- Registered
- 01 Jul 2025
- Attorney of record
- Suzanne M. Hengl
Goods and services
- Class 009 — Scientific and electric apparatus: Power controllers; operating systems being downloadable operating system programs; power regulating apparatus being power controllers; power units being electrical power distribution units; electronic power controllers; power conditioning apparatus, namely power line conditioners; electric power controllers; electronic power transformers; electronic control systems for machines, for engines, and for motors; electric conductors; connections, electric; couplings, electric; electrical rectifiers; electric converters; electricity transformers; electricity inverters; electricity exchangers; impedance transformers; distribution transformers; electronic transformers; step down transformers; step up transformers; electric voltage transformers; high voltage transformers; electrical reducing transformers; capacitive voltage transformers; dry-type transformers; electric current transformers; tap changers for electric transformers; apparatus and instruments for transforming electricity being transformers; apparatus and instruments for transforming the use of electricity being transformers; apparatus and instruments for transforming the distribution of electricity being transformers; energy regulators, namely voltage regulators, frequency regulators, and current regulators; energy control devices for energy management; inverters; transformers; apparatus and instruments for electricity storage, namely electric storage batteries and capacitors; anti-interference devices in the field of electricity, namely electromagnetic interference filters; apparatus and instruments for the distribution of electricity being power distribution panels, electricity distribution consoles, and electrical distribution boxes; apparatus and instruments for the provision of electricity signal correction, namely electrical signal attenuators; apparatus and instruments for the provision of voltage regulation being voltage regulators; apparatus and instruments for the provision of phase balancing being power factor correction units and phase modifiers; apparatus and instruments for the provision of electrical load balancing being power controllers and voltage controllers; apparatus and instruments for the removal of harmonics, namely passive and active filters adapted to fit into a power controller to filter harmonics; apparatus and instruments for the regulation of an electricity grid or network being voltage, current, and frequency regulators for electric power; apparatus and instruments for the regulation of electrical system frequency, voltage, phase and power factor being frequency, voltage, phase and power factor regulators for electric power; apparatus and instruments, namely electric sensors for the optimisation of power flow by real-time signal correction; none of the aforesaid goods being photovoltaic installations for generating electricity, solar panels, smart meters or batteries
Owner
Prosecution history
- 24 Mar 2026 — NOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED
- 04 Mar 2026 — AMENDMENT UNDER SECTION 7 - PROCESSED
- 03 Mar 2026 — TEAS SECTION 7 REQUEST RECEIVED
- 09 Dec 2025 — NOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED
- 19 Nov 2025 — CORRECTION UNDER SECTION 7 - PROCESSED
- 03 Nov 2025 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 11 Aug 2025 — TEAS SECTION 7 REQUEST RECEIVED
- 16 Jul 2025 — POST PUBLICATION AMENDMENT REVIEWED – NO ACTION TAKEN
- 13 Jul 2025 — ASSIGNED TO PETITION STAFF
- 01 Jul 2025 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 01 Jul 2025 — REGISTERED-PRINCIPAL REGISTER
- 05 Jun 2025 — EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED
- 19 May 2025 — TEAS POST PUBLICATION AMENDMENT RECEIVED
- 20 Dec 2024 — EXTENSION OF TIME TO OPPOSE RECEIVED
- 26 Nov 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED