CFS ARC
Live / Applied — Third extension granted (statement of use) (as of 04 Dec 2025)
What this means for you
Not registered yet, but its 20 Oct 2023 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98233546
- Mark type
- Stylized text
- Filed
- 20 Oct 2023
- Published for opposition
- 02 Apr 2024
- Attorney of record
- Christina M. Licursi
Goods and services
- Class 009 — Scientific and electric apparatus: Electromagnetic apparatus used to generate or measure magnetic fields; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity, namely, cryostats, poloidal diverters, superconducting toroidals, superconducting poloidals, and plasma injectors; apparatus and instruments for scientific or research purposes, in the field of energy conduction, transformation, accumulation, regulation, and distribution, namely, apparatus and instruments for measuring the presence and composition of fusion energy, and plasma, and diagnostic apparatus for detecting the presence of fusion energy and plasma; superconducting magnet power supply, electromagnet power supply, and electromagnets
- Class 011 — Environmental control apparatus: Nuclear fusion power plants
Owner
- Commonwealth Fusion Systems LLC, Devens, MA, US
- Commonwealth Fusion Systems LLC, Devens, MA, US
Prosecution history
- 05 Dec 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 04 Dec 2025 — SOU EXTENSION 3 GRANTED
- 04 Dec 2025 — SOU EXTENSION 3 FILED
- 04 Dec 2025 — SOU TEAS EXTENSION RECEIVED
- 13 May 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 12 May 2025 — SOU EXTENSION 2 GRANTED
- 12 May 2025 — SOU EXTENSION 2 FILED
- 12 May 2025 — SOU TEAS EXTENSION RECEIVED
- 03 Mar 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 04 Dec 2024 — SOU EXTENSION 1 GRANTED
- 03 Dec 2024 — SOU EXTENSION 1 FILED
- 03 Dec 2024 — SOU TEAS EXTENSION RECEIVED
- 04 Jun 2024 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 02 Apr 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 02 Apr 2024 — PUBLISHED FOR OPPOSITION