KANA PIPELINE

Live / Applied — Second extension granted (statement of use) (as of 25 Mar 2026)

What this means for you

Not registered yet, but its 19 Oct 2023 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
98231798
Mark type
Stylized text
Filed
19 Oct 2023
Published for opposition
28 Jan 2025
Attorney of record
Jonathan A. Menkes

Goods and services

  • Class 037 — Building construction and repair services: Construction services, namely, excavation and grading; General building contractor services; Building construction; Building construction consultancy services; On- site construction supervision; Construction information services; Excavation services for construction sites; Underground wet utilities construction and contracting services; Construction services, namely, commercial, industrial, residential, and institutional building construction; Installation and maintenance of utilities in construction sites, namely, storm drainage systems; Installation and maintenance of utilities in construction sites, namely, Fireline systems; Provision of construction information; Pipeline construction and maintenance services; Laying and construction of pipelines; Maintenance of construction equipment and machines
  • Class 042 — Scientific and technological services: Civil engineering services in the nature of installation and maintenance of storm drainage systems; Civil engineering services in the nature of installation and maintenance of Fireline systems; Civil engineering services in the nature of subsurface utility engineering and installation; Civil engineering services in the nature of installation and maintenance of residential, commercial, and municipal sewer systems

Owner

Prosecution history

  • 25 Mar 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 25 Mar 2026 — SOU EXTENSION 2 GRANTED
  • 24 Mar 2026 — SOU EXTENSION 2 FILED
  • 24 Mar 2026 — SOU TEAS EXTENSION RECEIVED
  • 26 Sept 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 25 Sept 2025 — SOU EXTENSION 1 GRANTED
  • 25 Sept 2025 — SOU EXTENSION 1 FILED
  • 25 Sept 2025 — SOU TEAS EXTENSION RECEIVED
  • 25 Mar 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 28 Jan 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 28 Jan 2025 — PUBLISHED FOR OPPOSITION
  • 22 Jan 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 07 Jan 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 07 Jan 2025 — EXAMINER'S AMENDMENT ENTERED
  • 07 Jan 2025 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED

View this trademark record on Marksy