MEGATRUSS
Live / Allowed — Notice of allowance issued (as of 30 Dec 2025)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 19 Oct 2023 filing date already counts against anyone who files later.
Record
- Serial number
- 98231139
- Mark type
- Stylized text
- Filed
- 19 Oct 2023
- Published for opposition
- 04 Nov 2025
- Attorney of record
- Christopher W. Brody
Goods and services
- Class 019 — Non-metallic building materials: beams made of wood; beams, not of metal; non-metallic nail plates in the nature of reinforcing materials for the assembly of roof trusses; non-metal hips for roofing; non-metallic composite materials for use in roofing, namely, manufactured, building, and construction timber and lumber; non-metallic composite roofing materials for use in roofing, namely, beams and trusses; non-metallic building materials for roofs, namely, timber trusses, structural beams, non-metal metallic composite timber structural beams, diagonal lumber webs and space frames in the nature of three-dimensional roof trusses; non-metallic ready mountable parts for roof constructions, namely, timber trusses, structural beams, non metal metallic composite timber structural beams, diagonal lumber webs and space frames in the nature of three dimensional roof trusses; non-metallic roof components for buildings, namely, timber trusses, structural beams, non-metal metallic composite timber structural beams, diagonal lumber webs and space frames in the nature of three-dimensional roof trusses; non-metallic girders being parts of walls; non-metallic materials for use in the construction of walls, namely, manufactured, building and construction timber for wall framing, and beams; studding being non-metallic framing for walls, namely, manufactured, building and construction timber for wall framing, and beams; modular structural units, not of metal, for the construction of prefabricated buildings, namely, non-metal modular homes; non-metallic structural frameworks for buildings; non-metallic structural sections for construction purposes, namely, non-metal framework for building; space frame structural units, not of metal, namely, non-metal framework for building; beams made of timber; structural timber; construction elements of timber, namely, building timber, manufactured timber, shaped timber, structural timber; timber building products, namely, building timber, manufactured timber, shaped timber, structural timber; non-metallic roof trusses; non-metallic hips for roofing; non-metallic prefabricated roof units, namely, non-metal roof trusses, diagonal lumber webs and non-metal roofing space frames in the nature of three-dimensional roof trusses; non-metallic roofing materials, namely, timber trusses, structural beams, non-metal metallic composite timber structural beams, diagonal lumber webs and space frames in the nature of three-dimensional roof trusses; non-metallic prefabricated roof structures, namely, non-metal roof trusses, non-metal roofing, non-metal joists, non-metal roofing frame beams; non-metallic prefabricated wall structures in the nature of prefabricated non-metal walls; non-metallic structural building elements, namely, non-metal floor trusses, non-metal roof trusses, non-metal roof beams, and non-metal flooring, wall and roofing components in the nature of beams; non-metallic structural building members, namely, non-metal floor trusses, non-metal roof trusses, non-metal roof beams, non-metal flooring, wall and roofing components in the nature of beams; non-metallic structural support members, namely, non-metal framework for building; non-metallic beams for building purposes; non-metallic building beams; non-metallic flooring; joists, not of metal
Owner
- Australian Engineered Solutions Pty Ltd, Cranbourne, VIC, AU
- Australian Engineered Solutions Pty Ltd, Cranbourne, VIC, AU
Prosecution history
- 30 Dec 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 04 Nov 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 04 Nov 2025 — PUBLISHED FOR OPPOSITION
- 29 Oct 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 23 Sept 2025 — WITHDRAWN FROM PUB - OG REVIEW QUERY
- 02 Sept 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 02 Sept 2025 — EXAMINER'S AMENDMENT ENTERED
- 02 Sept 2025 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
- 02 Sept 2025 — EXAMINERS AMENDMENT E-MAILED
- 02 Sept 2025 — EXAMINERS AMENDMENT -WRITTEN
- 21 Aug 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 21 Aug 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 21 Aug 2025 — TEAS REQUEST FOR RECONSIDERATION RECEIVED
- 11 Jul 2025 — NOTIFICATION OF FINAL REFUSAL EMAILED
- 11 Jul 2025 — FINAL REFUSAL E-MAILED