MINIPHASE
Live / Applied — Third extension granted (statement of use) (as of 02 Mar 2026)
What this means for you
Not registered yet, but its 16 Oct 2023 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98225046
- Mark type
- Stylized text
- Filed
- 16 Oct 2023
- Published for opposition
- 09 Jul 2024
- Attorney of record
- Grace Han Stanton
Goods and services
- Class 009 — Scientific and electric apparatus: Integrated circuits; electronic integrated circuits; integrated semiconductor circuits; Semiconductors; Integrated circuits, namely, chips; Electronic Chips; Printed Circuits; sensor-embedded integrated circuits; Electric switches; electrical switches; electronic transistors; transistors; Electrical controllers; power controllers; micro control units; battery chargers; regulating apparatus, electric; current rectifiers; voltage stabilizers; voltage regulator; stabilized voltage power supply; low voltage power supply; voltage regulators for electric power; induction voltage regulators; voltage regulators; flyback transformers; voltage monitor modules; electric current control devices; rectifier modules; wireless battery chargers; mobile phone chargers; smartphone battery chargers; charging appliances for rechargeable equipment; electronic cigarette chargers; battery chargers for mobile phones; wireless chargers; battery charge devices; Integrated circuits for the conversion and management of power used in electrical circuits; integrated circuit cards; integrated circuit cards, namely, smart cards; integrated circuit modules; electronic circuit boards; logic circuits; large scale integrated circuits; microchips; circuit boards; electronic circuits; electronic chips for the manufacture of integrated circuits; circuit boards provided with integrated circuits; electric control panels
Owner
- Monolithic Power Systems, Inc., San Jose, CA, US
- Monolithic Power Systems, Inc., San Jose, CA, US
Prosecution history
- 03 Mar 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 02 Mar 2026 — SOU EXTENSION 3 GRANTED
- 02 Mar 2026 — SOU EXTENSION 3 FILED
- 02 Mar 2026 — SOU TEAS EXTENSION RECEIVED
- 22 Aug 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 21 Aug 2025 — SOU EXTENSION 2 GRANTED
- 21 Aug 2025 — SOU EXTENSION 2 FILED
- 21 Aug 2025 — SOU TEAS EXTENSION RECEIVED
- 02 Mar 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 28 Feb 2025 — SOU EXTENSION 1 GRANTED
- 28 Feb 2025 — SOU EXTENSION 1 FILED
- 28 Feb 2025 — SOU TEAS EXTENSION RECEIVED
- 03 Sept 2024 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 09 Jul 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 09 Jul 2024 — PUBLISHED FOR OPPOSITION