UNFUCK THE PLANET
Live / Applied — Third extension granted (statement of use) (as of 02 Apr 2026)
What this means for you
Not registered yet, but its 06 Oct 2023 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98213337
- Mark type
- Stylized text
- Filed
- 06 Oct 2023
- Published for opposition
- 13 Aug 2024
- Attorney of record
- Charlene Minx
Goods and services
- Class 037 — Building construction and repair services: Building construction services; Construction of residential and commercial communities, roads, bridges, dams, underground utilities, environmental containment systems, water treatment and purification plants, solid waste treatment plants, renewable energy and energy generation equipment support structures and ancillary structures, and other municipal infrastructure facilities; Repair of computer hardware, electric motors, automobiles, boats, aircraft, buildings, heating, refrigerating, air-conditioning, drying, ventilating and dust extraction apparatus, renewable energy generation equipment, solar energy systems, and alternative energy products for residential and commercial use; Installation of renewable energy generation equipment, solar energy systems, and alternative energy products for residential and commercial use; Demolition of buildings
Owner
- Lowercase Ventures Management I, L.L.C., Jackson, WY, US
- Lowercase Ventures Management I, L.L.C., Jackson, WY, US
Prosecution history
- 03 Apr 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 02 Apr 2026 — SOU EXTENSION 3 GRANTED
- 02 Apr 2026 — SOU EXTENSION 3 FILED
- 02 Apr 2026 — SOU TEAS EXTENSION RECEIVED
- 19 Sept 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 18 Sept 2025 — SOU EXTENSION 2 GRANTED
- 18 Sept 2025 — SOU EXTENSION 2 FILED
- 18 Sept 2025 — SOU TEAS EXTENSION RECEIVED
- 09 Apr 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 09 Apr 2025 — SOU EXTENSION 1 GRANTED
- 09 Apr 2025 — SOU EXTENSION 1 FILED
- 08 Apr 2025 — SOU TEAS EXTENSION RECEIVED
- 08 Oct 2024 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 13 Aug 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 13 Aug 2024 — PUBLISHED FOR OPPOSITION