LET'S BUILD IT
Live / Applied — Statement of use — processing complete, to examiner (as of 27 Mar 2026)
What this means for you
Not registered yet, but its 30 Sept 2023 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98205254
- Mark type
- Stylized text
- Filed
- 30 Sept 2023
- Published for opposition
- 28 Jan 2025
- Attorney of record
- Gerald E. Hespos
Goods and services
- Class 019 — Non-metallic building materials: geosynthetic clay liners (GCL) for lining landfills; geotextiles, namely fabric and sheeting for lining landfills and waste retention sites; extruded plastic sheeting for landfills and waste retention sites to contain moisture in the landfill and minimize contamination of the soil; textured resin sheets for lining waste disposal sites to contain moisture in the landfill and minimize contamination of the soil
- Class 042 — Scientific and technological services: custom design and engineering of plastic sheeting for landfill lining; providing engineering information in the field of landfill lining and liquid retention; geotechnical engineering; civil infrastructure engineering services; providing technical information in the field of design of landfill liners and liners for liquid retention purposes
Owner
- Agru America, Georgetown, SC, US
- Agru America, Georgetown, SC, US
Prosecution history
- 27 Mar 2026 — STATEMENT OF USE PROCESSING COMPLETE
- 25 Sept 2025 — USE AMENDMENT FILED
- 27 Mar 2026 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 25 Sept 2025 — TEAS STATEMENT OF USE RECEIVED
- 18 Sept 2025 — SOU TEAS EXTENSION RECEIVED
- 18 Sept 2025 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
- 18 Sept 2025 — ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
- 18 Sept 2025 — TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
- 15 Sept 2025 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
- 15 Sept 2025 — ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
- 15 Sept 2025 — TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
- 25 Mar 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 28 Jan 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 28 Jan 2025 — PUBLISHED FOR OPPOSITION
- 22 Jan 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED