HELIX
Live / Applied — Third extension granted (statement of use) (as of 18 Mar 2026)
What this means for you
Not registered yet, but its 29 Sept 2023 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98204626
- Mark type
- Stylized text
- Filed
- 29 Sept 2023
- Published for opposition
- 25 Jun 2024
- Attorney of record
- Holly Pranger
Goods and services
- Class 009 — Scientific and electric apparatus: Downloadable software for viewing, flagging, and archiving video clips recorded by a camera of different types of events of interest, at the time they occurred; Downloadable software for enabling users to search, including on a continual basis through user-created alerts, an electronic index of different types of events of interest and user-configurable attributes for specified attribute values, receive results for events with attribute values that match the search parameters, and retrieve and view videos and video clips of the matching event; Downloadable software for viewing, playing, sorting, filtering, editing, visualizing, and exporting media, sensor, and analytics data related to physical spaces; Downloadable software for enabling users to search, including on a continual basis through user-created alerts, electronic databases of media, sensor, and analytics data related to physical spaces for specified values, receive results that match the search parameters, and retrieve and view data containing the matching values
Owner
- Verkada Inc., San Mateo, CA, US
- Verkada Inc., San Mateo, CA, US
Prosecution history
- 31 Mar 2026 — TEAS STATEMENT OF USE RECEIVED
- 19 Mar 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 18 Mar 2026 — SOU EXTENSION 3 GRANTED
- 15 Mar 2026 — SOU EXTENSION 3 FILED
- 16 Mar 2026 — SOU TEAS EXTENSION RECEIVED
- 07 Oct 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 06 Oct 2025 — SOU EXTENSION 2 GRANTED
- 02 Oct 2025 — SOU EXTENSION 2 FILED
- 03 Oct 2025 — SOU TEAS EXTENSION RECEIVED
- 26 Jul 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 25 Jul 2025 — CORRECTED NOA E-MAILED
- 25 Jul 2025 — SOU EXTENSION 1 GRANTED
- 18 Mar 2025 — SOU EXTENSION 1 FILED
- 25 Jul 2025 — DIVISIONAL PROCESSING COMPLETE
- 19 Mar 2025 — DIVISIONAL REQUEST RECEIVED