XP8E

Live / Applied — Third extension granted (statement of use) (as of 28 Oct 2025)

What this means for you

Not registered yet, but its 20 Sept 2023 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
98188535
Mark type
Stylized text
Filed
20 Sept 2023
Published for opposition
28 May 2024
Attorney of record
Heather Smith-Carra

Goods and services

  • Class 007 — Machines and machine tools: Machines for the assembly and packaging of electronic semiconductor chips; machines for manufacturing semiconductors, and structural parts therefor; semiconductor manufacturing machines; semiconductor manufacturing machines and systems composed of a vacuum chamber for accommodating semiconductor wafers and structural parts therefor and machines for handling and transferring semiconductor wafers into and out of the vacuum chamber, and structural parts therefor; machines for the treatment of semiconductor wafers, namely, semi-conductor wafer processing machines, and structural parts therefor; industrial robots for the handling of semiconductor wafers; reactors for processing semiconductor wafers, namely, industrial chemical reactors for the thermal treatment of semiconductor wafers and industrial chemical reactors for chemical vapor deposition
  • Class 009 — Scientific and electric apparatus: Electrical reactors for processing semiconductor wafers; electronic controllers for industrial robots for use by the semiconductor industry; electronic control systems for semiconductor manufacturing machines; structural parts for electrical reactors for processing semiconductor wafers

Owner

Prosecution history

  • 29 Oct 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 28 Oct 2025 — SOU EXTENSION 3 GRANTED
  • 28 Oct 2025 — SOU EXTENSION 3 FILED
  • 28 Oct 2025 — SOU TEAS EXTENSION RECEIVED
  • 19 Jul 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 18 Jul 2025 — SOU EXTENSION 2 GRANTED
  • 18 Jul 2025 — SOU EXTENSION 2 FILED
  • 18 Jul 2025 — SOU TEAS EXTENSION RECEIVED
  • 03 Mar 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 18 Jan 2025 — SOU EXTENSION 1 GRANTED
  • 17 Jan 2025 — SOU EXTENSION 1 FILED
  • 17 Jan 2025 — SOU TEAS EXTENSION RECEIVED
  • 23 Jul 2024 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 28 May 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 28 May 2024 — PUBLISHED FOR OPPOSITION

View this trademark record on Marksy