MODULAR DATA CENTERS
Live / Applied — Third extension granted (statement of use) (as of 09 Mar 2026)
What this means for you
Not registered yet, but its 13 Sept 2023 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 98178162
- Mark type
- Design + words
- Filed
- 13 Sept 2023
- Published for opposition
- 16 Jul 2024
- Attorney of record
- Gordon E.R. Troy, Esq.
Goods and services
- Class 006 — Metal goods: Modular metal structures in the nature of data centers to house piping, cable trays, computer racks and wiring for use with environmental cooling units, systems and controls, power management units, electrical switchboards, electrical distribution board system in the nature of power distribution panels, electrical controllers, electrical power distribution units, electrical cables and electrical connectors, batteries, air handling units, fire protection, fire suppression equipment and controls, fiber, communication and telecommunication hardware and software, surveillance, personal identification and security systems, electric sensors and sensor systems and utility systems; Prefabricated metal buildings, namely, portable rooms in the nature of data centers to house piping, cable trays, computer racks and wiring for use with environmental cooling units, systems and controls, power management units, electrical switchboards, electrical distribution board system in the nature of power distribution panels, electrical controllers, electrical power distribution units, electrical cables and electrical connectors, batteries, air handling units, fire protection, fire suppression equipment and controls, fiber, communication and telecommunication hardware and software, surveillance, personal identification and security systems, electric sensors and sensor systems and utility systems
Owner
- MODULAR DATA CENTERS INDÚSTRIA COMÉRCIO E SERVIÇOS S.A., Sao Paolo, BR
- MODULAR DATA CENTERS INDÚSTRIA COMÉRCIO E SERVIÇOS S.A., Sao Paolo, BR
Prosecution history
- 10 Mar 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 09 Mar 2026 — SOU EXTENSION 3 GRANTED
- 09 Mar 2026 — SOU EXTENSION 3 FILED
- 09 Mar 2026 — SOU TEAS EXTENSION RECEIVED
- 26 Aug 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 25 Aug 2025 — SOU EXTENSION 2 GRANTED
- 25 Aug 2025 — SOU EXTENSION 2 FILED
- 25 Aug 2025 — SOU TEAS EXTENSION RECEIVED
- 02 Mar 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 28 Feb 2025 — SOU EXTENSION 1 GRANTED
- 28 Feb 2025 — SOU EXTENSION 1 FILED
- 28 Feb 2025 — SOU TEAS EXTENSION RECEIVED
- 10 Sept 2024 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 16 Jul 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 16 Jul 2024 — PUBLISHED FOR OPPOSITION